INDUSTRIAL INCINERATORS

Large incinerators – INDUSTRIAL INCINERATORS – specs below. 2.) Size requirement for the incinerators is 750 — 850 kg capacity 3.) The bum rate should be 80 LL 100 kg/ hour. 4) The primary chamber shouId have an operating temperature of 900 -1200 degree C. 5) The incinerator should hate a high temperature secondary chamber […]

Incinerator Introduction

  Principle of the Incinerator equipment is incineration/combustion/burn. Generally, the function is waste treatment for Solid waste, Liquid waste, Gas waste, etc.   The main body is one combustion chamber (at least), Refractory line or firebrick, Insulation materials and the outer plate. Ignition element is external oil or gas burner. The burner can be running […]

New Notice of Intent to Sue EPA

US EPA Receives New NOI RE: New Notice of Intent to Sue EPA The U.S. Environmental Protection Agency has recently received a notice of intent to sue (NOI) that may be of interest to you. The NOI concerns EPA’s alleged failure to revise its effluent guidelines for the Meat and Poultry Products category. This information […]