Day: May 11, 2023

250kgs per human resources capacity waste incinerator

Burner Design TS250 PLC, Review This design is small waste incineration tools for little waste result. Construction is dual/double combustion chamber with 02 units oil burner, batch load incineration equipment.  Waste feed chamber is 1800Liters (1.8m3, TS250 PLC). Primary & Secondary combustion chambers and smoke filter chamber. Batch load on the bottom of chamber. Incinerator […]