WASTE INCINERATOR

 

–          150 KG/HR

–          Compliant with EU rules, Directive 2000/76/EC

–          Fuel type: Diesel

–          Easy management and maintenance

–          Temperatures:

850 deg C for municipal waste

1000 deg C for medical waste

1100 deg C for dangerous waste containing halogenated organic substances with content of chlorine or its compounds.

little capability heaters


1    Basic Plant Design    An approved plant must have four distinct sections that demonstrate three principles of Turbulence, Residence Time and Temperature are inbuilt in the plant design .The regulated sections may include but not limited to:

Overall plant layout.
Feed chamber/ charging
Primary Combustion Chamber.
Secondary Combustion Chamber.
Particulate Scrubbers
Acid Gas Scrubbers
The stack/ chimney.
2    Feeding And Charging    Controlled hygienic, mechanical or automatic feeding methods have to be used which will not influence the air temperature in the primary and secondary chambers of the incinerator negatively.

No waste is to be fed into the incinerator:

1.    Until the minimum temperatures have been reached.
2.    If the minimum combustion temperatures are not maintained.
3.    Whenever the previous charge has not been completely combusted in the case of batch feeding.

4.    Until such time as the addition of more waste will not cause the design parameters of the incinerator to be exceeded.

3    Primary Combustion Chamber    The primary combustion chamber must:

1.    Be accepted as the primary combustion zone.
2.    Be equipped with a burner/s burning gas/fuel or low sulphur liquid fuels. Other combustion methods will be judged on merits.

3.    Ensure primary air supply is controlled efficiently
4.    Ensure minimum exit temperature is not less than 850oC

4    Secondary Combustion Chamber (Afterburner).    The secondary combustion chamber must:

1.    Be accepted as secondary combustion zone.
2.    Be fitted with secondary burner/s burning gas or low sulphur liquid fuel or any suitable fuel.

3.    Ensure secondary air supply is controlled efficiently.
4.    Ensure flame contact with all gases is achieved.
5.    Ensure residence time is not less than two (2) seconds.
6.    Ensure the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100oC.

7.    Ensure the oxygen content of the emitted gases is not less than 11%.
8.    Ensure both primary and the combustion temperatures are maintained until all waste has been completely combusted

5    Particulate Removers    A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:

Cyclone separator
Electrostatic precipitators
Fabric filters
6    Chimney / Stack    1.    The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all roofs. The topography and height of adjacent buildings within 50 meters radius should be taken into account.

2.    If possible the chimney should be visible to the operator from the feeding area.
3.    The addition of dilution air after combustion in order to achieve the requirement of these guidelines is unacceptable.

4.    The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting gases.

5.    Point for the measurement of emissions shall be provided.

7    Instrumentation    Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary chambers.

2.    An audible and visible alarm must be installed to warn the operator when the secondary temperature drops to below the required temperature.

3.    In addition to the above the following instruments may also be required.
A carbon monoxide and/or oxygen meter/recorder
A smoke density meter/recorder
A gas flow meter/recorder
A solid particulate meter/recorder
Any other instrument or measurement that may be considered necessary

8    Location / Siting    1.    Must be sited in accordance with the relevant local municipal authority planning scheme, the topography of the area and be compatible with premises in the neighborhood,

2.    Must be housed in a suitably ventilated room.

9    Emission Limits    1.    Combustion efficiency:

Combustion efficiency (CE) shall be at least 99.00%
The Combustion efficiency is computed as follows;

C.E=             % CO2           x 100
% CO2 + CO

2.    The temperature of the primary chamber shall be 800 ± 50o C

3.    The secondary chamber  gas residence time shall be at least 1 (one) second at 1050 ± 50o C, with 3% Oxygen in the stack gas.

4    Opacity of the smoke must not exceed 20% Viewed from 50 meters with naked eyes
5.    All the emission to the air other than steam or water vapour must be odourless and free from mist, fume and droplets.

6.    The Authority may require that the certificate holder have tests carried out by an accredited institution to determine stack and/or ground level concentrations of the following substances.

Cadmium and compounds as     Cd
Mercury                                      Hg
Thallium                                     Tl

Chromium                                  Cr
Beryllium                                    Be
Arsenic                                       As
Antimony                                    Sb
Barium                                        Ba
Lead                                            Pb
Silver                                          Ag
Cobalt                                         Co
Copper                                        Cu
Manganese                                  Mn
Tin                                               Sn
Vanadium                                     V
Nickel                                           Ni
Hydrochloric                                HCL
Hydrofluoric acid                         HF
Sulphur dioxide                           S02

7.    A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where:

DRE = [(Win – Wout)/Win]*100
Where: Win = mass feed rate of the POHC in the waste stream fed to incinerator, and
Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.

8.    The average dioxin and furan concentration in the emissions should not exceed 80ng/m3 total dioxins and furans if measured for a period of 6 to 16 hours.

Note:
All pollutant concentrations must be expressed at Oo C and 1.013 x 10 5 N/m2, dry gas and 11% oxygen correction.

Oxygen correction is computed as:

Es =     21 – Os    x EM
21 – OM

Where:    Es    = Calculated emission concentration at the standard percentage oxygen concentration
EM    = Measured emission concentration
Os    = Standard oxygen concentration
OM    = measured oxygen concentration

10    Operation    1.    Materials destined for incineration should be of known origin and composition and must be only incinerated in a furnace that is registered for the particular type of waste.

2.    A record must be kept of the quantity, type and origin of the waste to be incinerated.
3.    The incinerator must be preheated to working temperature before charging any waste.
4.    The incinerator must not be overcharged.
5.    The incinerator must be in good working order at all times and must not be used if any component fails. Any malfunction should be recorded in a log book and reported to the relevant authority.

6.    The incinerator operator and all relevant staff must be trained to the satisfaction of the relevant control authority.

11    Housekeeping    The site where the incinerator is built must:

1.    Have running water.
2.    Have a solid floor.
3.     Have lighting if 24hrs operation
4.    Have fly ash containerization and storage before disposal.

12    Health & Safety (Protective Gear)    1.    Staff handling waste must be well trained on safe handling of hazardous wastes
2.     Staff must be provided with appropriate  protective gear such as, gas mask, aprons, gumboots, helmets, gloves, goggles.

3.     Caution and Warning signs must be provided.
4.     Fire fighting equipment must be provided
5.     There should be no smoking or eating on the site.


igualmente residuos biomédicos y peligrosos

Los requisitos se determinan, en parte, exactamente por cómo se designa la tierra en los planes de avance del gobierno del área (es decir, el uso de la tierra

zonificación).

Los quemadores de residuos potentes son sistemas fabricados que están calificados para alcanzar con frecuencia niveles de temperatura de fusión superiores a 1000oC.

e igualmente un tiempo de espera de al menos uno. La incineración de

También los residuos biomédicos e inseguros y también los lodos de alcantarillado requieren ciertos dispositivos, controles funcionales y capacitación que son

más allá de la matriz del papel existente.
Sistema de aire ardiendo. Los gases de esta combustión insuficiente ingresan a una segunda cámara de fusión donde hay suficiente aire

se instila y también se consigue una combustión completa.

Exceso de cámara solitaria Mayor que una cantidad adecuada de aire (hasta un 50% más que la cantidad
Sistema de aire de aire necesario) se infunde en la cámara de descongelación solitaria para completar la quema total de los desechos.

Alimentación constante Un procedimiento de incineración que permanece en un ciclo de cobertizo continuo. Una alimentación constante

Establecer incineradores de aire manipulado de doble cámara para piensos que actualmente funcionan en varias áreas comerciales remotas en el norte

Canadá y Alaska. Por lo general, se tienen en cuenta para tener las mejores calidades superiores posibles de todos los calentadores y también se abren

Las estrategias de quema señaladas, requieren ser desarrolladas para el tipo y la cantidad de desechos que se desecharán. Los aspectos más destacados de este

tipo de incinerador son:

El procedimiento de fraguado permite un mejor control del nivel de temperatura y del aire durante todo el procedimiento de cobertizo.
Se puede destruir una amplia selección de desechos, es posible que sea necesario segregar y volver a mezclar los desechos para adquirir un

calefacción residencial consistente que vale cerca del aspecto de diseño del incinerador.
En la superficie, se requiere gas suministrado y energía para los calentadores, además de ventilación forzada de aire. Un doble

El sistema de aire administrado por cámara definitivamente disminuirá los problemas con la atracción turística de mascotas como la producción de base y, además, cenizas volantes y humo.

se reduce.

El área 2.3.2 está planificada para proporcionar al visitante del sitio una breve introducción a los calentadores. No está destinado a dar

información apropiada para el diseño, selección o procedimiento de un sistema de incineración. Cualquiera que tenga en cuenta la adquisición de

Un sistema de incineración debe comunicarse primero con el proveedor del sistema o con otras personas calificadas con experiencia en el

incineración de residuos sólidos.

Los requisitos se determinan, en parte, por la forma exacta en que se marca la tierra en los planes de crecimiento del gobierno del área (es decir, el uso de la tierra

zonificación).

Los incineradores de residuos sólidos son sistemas diseñados que están calificados para completar consistentemente niveles de temperatura de combustión superiores a 1000oC.

y además un tiempo de espera de al menos uno. La incineración de

También los residuos biomédicos y nocivos y también los lodos de alcantarillado requieren ciertas herramientas, controles funcionales y capacitación que son

más allá del rango del presente artículo. Un sistema dual que funciona correctamente

El sistema de aire gestionado por la cámara definitivamente reducirá los problemas con la atracción de visitantes de animales como la producción de base y también cenizas volantes y humo.

se baja. Cualquier tipo de individuo que esté considerando la adquisición de

un sistema de incineración debe ponerse en contacto primero con el proveedor del sistema o con otras personas certificadas con experiencia en el

incineración de residuos fuertes.

se reduce.

El área 2.3.2 está planificada para proporcionar al visitante una breve introducción a los quemadores. No tiene la intención de proporcionar

información adecuada para el estilo, la elección o el funcionamiento de un sistema de incineración. Cualquier persona que esté considerando la adquisición de

un sistema de incineración primero debe ponerse en contacto con el proveedor del sistema o con otras personas calificadas con experiencia en el

incineración de residuos sólidos.

оборудование для кремации домашних животных

Камера дожигания газов

* Горелка сжигания газов,

* Устройство впрыска воздуха, позволяющее полностью сжигать газы,

* Устройство воздухозаборника охлаждения отходящих газов,

* Оболочка отвода сгоревших газов.

* Каркас из прочной листовой стали с опорой соединения.

* Состав огнеупора;

 Огнеупорный бетон:

Толщина: ≥150 мм

Природа: 65% Al2O3

Изоляция в волокнистой панели:

Толщина: ≥85 мм

 Природа: кальций

* Горелка топливная, моноблочная литая направляющего типа с горизонтальным пламенем, освещением и безопасностью электронного розжига,

постоянная вентиляция, электромагнитный затвор регулирующий и запорный вентиль.

* Вторичный впрыск воздуха для обеспечения идеального содержания кислорода.

19. Блок управления, обеспечивающий полный цикл сгорания.

20. Вентилятор:

* Электровентилятор, распределяющий вторичный воздух, регулирование расхода воздуха осуществляется клапанами и

после контроля автоматического цикла.

21. Контроль и регулирование:

Коробка управления водонепроницаема от пыли, включая:

* Выключатель автоматического выключателя для каждого двигателя (вентиляторы и горелки).

* Таймер с регулируемой выдержкой времени для регулирования каждой горелки.

* Регулятор с цифровым контролем температуры горения.

* Регулятор с цифровым контролем температуры дожигания.

* Электрическая коробка.

  1. Удаление золы должно производиться в нижней части камеры сгорания, или удаление золы должно быть автоматическим или ручным.

партия золы.

  1. Система фильтрации технологического процесса: скруббер следует указать как необязательный
  2. Соответствие стандартам излучения: BS 3316 или эквивалентный стандарт
  3. Способность обрабатывать пластик: не менее 40% по весу
  4. Соответствие производственным требованиям CE: BS EN 746-2-1997

22. Поставщик должен предоставить партии запасных частей первой необходимости и расходные материалы для установки для сжигания отходов.

23. Гарантия на установленную печь составляет один год.

24. Поставщик должен произвести установку инсинератора на месте.

  1. Техническое обучение операторов должен проводить технический специалист из

фабрика; он будет состоять из лечебного и профилактического обслуживания, использования машин и т. д.

the three incinerators for burning as well as incineration of medicines as well as harmful compounds

Demands and specs for the process of supply, installation, operation and ensure the three incinerators for burning and incineration of medications and also harmful compounds for customizeds division

Free 3 years warranty for incinerators from shipment day. In addition of complimentary extra components ensure letter ought to be valid for 10 years from the end date of assurance.
Electric device should be delivered with service guidebook in English
Electric capacity need to be 380-220 v 60 Hz for all devices
Provided time asap
Validity of deal ought to be not much less than 6 months
In situation of order, we need two certifications of origin that must be stamped from Saudi consular office in your nation
Business billing (certified from Chamber of Business).
Two initial costs.
Send out a person to fix as well as educate our staff for 5 people in each area.
Send your manuals for installation systems.
Waiting for your excellent reply.
Please offer details for the complying with,.
1-Technical explanation includes technological specifications, scope of job, the needs of the procedure and also upkeep.
2- Technical explanation for service technicians training and heater drivers.
3- Brochures of stove with all the called for specs

The offer cost must include the following;-.
1. Educating for professionals and also drivers for a period not much less than two days at each website and give trainees training certificates.
Files have to include all the info such as pamphlets, technical sources, operating, maintenance guidebooks, as well as pamphlets dealing with the key-board.
2- Letter from the supplier to give three years warranty for incinerators from delivery day. In addition of free spare parts ensure letter should be valid for one decade from the end day of guarantee.
3- Offer certification that the incinerators are environmentally friendly and also attach proof that environmental management companies in the country of Origin and also your product should be discharges cost-free as a result of the level of sensitivity of its global air ports.
4-copmany should committed shipment, procedure, and also setup within 60 days from the date of site jobs detection.
5- Train 5 individuals for two days for each and every device for a duration of two days for installation, operation, and safety. Provide certifications.
GARANTEE.
Supplies operating as well as emergency situation maintenance also provides totally free spare components for 3 from the starting day of the project. The firm needs to make regular upkeep every 3 months as well as raise the upkeep report to the administration of public problem and also Maintenance.
The business must make all the upkeep work also adjustment of the control and defense tools and also filters/ filters detoxify insulation.
Specs of ovens:.
– Mounting a readymade concrete base (Precast) with Elevation 30 cm in the air and also 20 centimeters listed below the surface area of the planet.
– The dimensions of the base are raised by (2 meters) from the side of burners.
– The remainder of the accessories in all the trends even allows the employee directly feeding as well as upkeep job, cleansing and relocate conveniently thinking about the propensities of the base towards the door for water drainage of water.
– The floor finishing should be high-quality epoxy paint.
– Mount anti-rust and warm Umbrella of brick and also steel (pyramid form) of (5) meters elevation above the ground which set up with the edge of the concrete base by thick galvanized columns.
– This umbrella Cover the website heater and also allow bringing the chimney.
– The website is surrounded by an iron fencing (sheet metal) 3 meters elevation from the surface of the planet in order to shield the incinerators from black blizzard.
– The iron fence must have a 5 meters Width entrance.
– Automatic anti-rust as well as heat electrical circuit should be provided.
– The heating systems are very efficient, emissions-free, risk-free, and environmentally friendly as well as have ability of not less than 3,000 kg of materials as well as the price of melting at least 400 kg/ h.
– The approach of feeding the furnace with a side slot or from the leading and also the exhaust of the smoke is entirely stopped.
– a heating system Have to have two spaces, among them is the main space of not much less than the “5” ranges to the process of burning materials and various other secondary area of not much less “2” ovens to shed resulting gas from the first procedure as well as the smokeshaft.
– The primary component of the body of the heating system is stainless steel box, the thickness of not much less than 7 mm with a layer of zinc phosphate layered with aluminium reflector to warm.
– the thickness of the door of 150 mm as well as a hardness of not less than 170 kg/ m 3 to be scorched, automatic detailed remote system.
– Heaters have to be devastating adequate to burn and blaze the material which stated formerly.
– heating systems must have certifications are supported worldwide ventures and government competent for environmental protection In the country of origin or the General Presidency of Meteorology as well as Setting Protection in Saudi Arabia.
– The stove can benefit 24 hr so regarding allow for the burning of materials for a period of not much less than 12 successive hours and the remainder for air conditioning and gives full gas container with a capability of 1000 L to turn on the oven.
– Must have an automatic ignition and diesel is made use of.
– a heating system has the capacity to hold up against severe temperatures as much as “130o c As well as also, it assures constant procedure of which can be used for 1 day with the capacity to get rid of residues throughout the work of the stove, Protecting layer of calcium have to be present in the rooms with Density not much less than 50 mm as well as a wall thickness of 100 mm.
– Isolation of shedding area: the area in between the walls have to be of the “stainless-steel”. Furthermore, shed space has to full of Thermal insulation product.
– Guarantee that the combustion of materials released in the secondary room must be at least two seconds duration as well as the space is lined with high-density ceramic fibbers.
– Incinerators should contain a system for handling (purification) gasses before emission of the smoke.
– Burners have to have the capacity of self-cooling after completion of the daily operating period.
– Incinerators have to have smokeshaft not much less than “4 meters” height from the surface of the oven, additionally, it should be thermally protected and also non-rust able, as well as need to likewise be removable, installment as well as tide default.
– Electrical capacity called for “220/ 380-volt “60 hertz.
– Incinerators have to be fitted with a control board of the digital tricks to monitor all the essential indicators of activation tricks, as well as start-up and switch off so as to be separated inside a steel box with the presence of the following:.
Alarm system Sensor in the event of (accidents “heater” or filtration device or heat leakage or interior connections as well as electrical wiring).
Screens for the temperature level of the rooms.
Aerosols Filter signs/ monitors.
Area temperature level sensors.
Indicators for furnaces as well as index overload.
Timer for Extinguish the stove instantly depending upon the moment called for.
– All devices should be very immune to exterior conditions such as high temperature (50oc).
– All doors have to have unique lock are not allowed non-persons assigned to function.
– Supplying fire extinguisher for each website with an ability of 10 kg at least

pet incinerator deisel

and forced air exhaust stacks (or chimneys).

 

The charging system shall consist of, as a minimum, a hopper for top feeding and mechanically operated hydraulic

 

charging ram or augur. To prevent warpage or excessive thermal expansion, a charger cooling system using either

 

air or water shall be provided.

 

Primary combustion chamber shall be either the rotary- or stationary fixed-hearth (or kiln) type incinerator. Burner

 

and combustion air controls shall be fully automatic comprising of, as a minimum, electronic ignition and all

 

necessary interlocks and safety devices to provide safe operation. The chamber and burner shall be designed to

 

maintain a minimum combustion temperature of at least 700 to 870 C (1300 to 1600 F), but shall not to exceed 980

 

C (1800 F). The ash-removal system shall consist of the automatic continuous removal of the ash into an ashquench

 

pit where cooled by water and removed by conveyor.

an animal incinerator for the cremation of dogs

We have a 70 bed medical facility in namibia. There is a potential of getting customers from various other regional doctors.
a little burners (ex. please see attached) for some empty chemical bags. Can you please supply me with some details info about these sort of incinerators (small range). a pet incinerator for the cremation of pets and pet cats. It will certainly be solitary use of each animal seperately.Initially we are planning to start this Pilot Task with the National Medical facility, to convince the Ministry Officials as well as on its success to take this project to the Teaching Hospitals, Area and Base Hospitals in the Country.municipality requirement 4 crematory machine for bodies. I require some info regarding cost, kine of power for activation, harmful exhaust, The incinerator we are looking must be with the benefits of Warm recycling system, usage of hot water, and so on. Capability– 150-200 kgs/hr and with International standards.get more details about the Family pet Cremation Tools, specifically for canines as well as felines.

แบบฝักบัวผ่านอากาศสำหรับบุคลากร

2019-05-13 อุปกรณ์ฟอกอากาศ 414 views

การแนะนำสินค้า

ฝักบัวลมเป็นอุปกรณ์สำหรับฟอกอากาศคนและป้องกันไม่ให้อากาศเสียเข้าสู่พื้นที่สะอาดใช้กระแสลมสะอาดความเร็วสูงเพื่อขจัดฝุ่นละอองบนพื้นผิวของเสื้อผ้าหรือวัสดุบนบุคลากร ในขณะเดียวกัน ยังทำหน้าที่เป็นห้องล็อกอากาศเพื่อป้องกันไม่ให้อากาศภายนอกสร้างมลพิษให้กับห้องสะอาดหรือห้องสะอาดระดับต่ำถึงระดับสูง

ห้องอาบน้ำแบบใช้ลมตรงเป็นหนึ่งในรูปแบบที่นิยมใช้กันมากที่สุด มีประตู 2 บานแยกออก รูปทรงเรียบง่ายสวยงาม และมีฟังก์ชั่นประสานกัน สามารถใช้เป็นห้องกันชนสำหรับห้องคลีนรูมระดับต่างๆ เพื่อป้องกันการปนเปื้อนข้ามเมื่อมีคนเข้าและออก

คุณสมบัติของสินค้า:

อากาศในห้องอาบน้ำแบบใช้ลมถูกพัดเข้าสู่กล่องแรงดันสถิตโดยพัดลมผ่านตัวกรองหลัก กรองอากาศให้บริสุทธิ์ด้วยตัวกรองประสิทธิภาพสูง และขับออกจากหัวฉีดด้วยความเร็วสูง จึงเป่าฝุ่นที่ติดอยู่กับตัวเครื่องและ พื้นผิวของวัตถุที่บรรทุกและป้องกันอากาศที่ไม่บริสุทธิ์ เข้าสู่พื้นที่การทำให้บริสุทธิ์  

คุณสมบัติของสินค้า:

* โครงสร้างผลิตภัณฑ์แข็งแรงและติดตั้งง่าย
*
ระบบควบคุม PLC มีความเสถียร และมีประสิทธิภาพ หากไฟฟ้าดับ ประตูห้องอาบน้ำจะปลดล็อคโดยอัตโนมัติ
*
เริ่มต้นการกรองสองขั้นตอนประสิทธิภาพสูง ประสิทธิภาพสูงถึง 99.99% ประสิทธิภาพ @0.3um

* หัวดูดสแตนเลสปรับความเร็วลมได้ 360 องศา

* ง่ายต่อการเปลี่ยนอุปกรณ์เริ่มต้นและมีประสิทธิภาพ
*
ติดตั้งไฟฟอกเฉพาะสำหรับห้องคลีนรูม
*
ปรับเวลาเป่าได้ (10-99 วินาที)
*
ด้วยประตูแบรนด์เยอรมันที่ใกล้ชิด

* ฟังก์ชั่นเชื่อมต่อที่เชื่อถือได้
*
พร้อมปุ่มหยุดฉุกเฉิน

ภาพวาดมาตรฐาน

พารามิเตอร์ทางเทคนิค:

แสดงรายละเอียด

หัวฉีดสแตนเลสปรับทิศทางได้ 360 องศา

บานประตูแบรนด์ดังของเยอรมัน

มอเตอร์แรงดันสถิตย์สูงและปริมาตรอากาศสูง large

U.S. HV นำเข้ากระดาษกรองกรองประสิทธิภาพสูง filter

URL เนื้อหาเพิ่มเติม: www.ecolead.cn โทร: 025-57138032

установка для сжигания медицинских отходов на дизельном топливе

Высокотемпературная установка для сжигания отходов, модель D. MB 750XL Скорость горения – минимум 150 кг / час Вес (кг) – 4000 кг Вторичная камера

(двухкамерный с дожиганием) Время удержания газа 2 секунды Топливо Дизель Источник питания для блока управления 220В-240, одинарный

фаза 50-60 Гц Минимальная рабочая температура 1200 oC Годовой пакет запчастей для полной ремонтопригодности 10-метровый шланг

трубка. Топливный бак на 1100 литров + система трубопроводов В контейнере (контейнер будет служить жилищем) Дополнительный удлинитель дымохода

Высота 1 метр Гарантия один (1) год.

Инсинератор 20 кг: 03 шт.

Мусоросжигательный завод с электрическим управлением.

Двухкамерный инсинератор производительностью 20 кг / час.

Инсинератор с низкими затратами на обслуживание и эксплуатацию; Оснащен автоматической панелью управления и прост в использовании с

электромагнитная блокировка двери.

Основная камера сокращения отходов с температурой 900 ° C.После вторичной камеры сгорания газов, образующихся в первичной камере.

не менее 1100 ° С.

Остатки углерода в золе менее 5% по весу в соответствии с Европейской директивой 2000/76 / EC.

С огнеупорной футеровкой из более качественных материалов
1 / Стоимость установки для сжигания медицинских отходов мощностью 200 кг / час.
2 / (Срок CIF) Стоимость доставки с завода в ПАПУА-НОВАЯ ГВИНЕЯ морской порт ЛАЭ, провинция Моробе
3 / Стоимость 2 инженеров Clover для контроля, установки, обучения наших инженеров и ввода в эксплуатацию медицинского оборудования; трата

мусоросжигательный завод.

incineration Heater for burning patalogical

incineration Heater for burning patalogical (such as human tissue or blood) as west

The weight of this west materials is 700 kg per month and also we require an isolated heating system

Without fume as well as any kind of damaging gas

. INCINERATOR SPECIFICATION

# Summary Specification

1 Burning Capacity – – 400 kg/time and also must not be much less than 300 kg/time. Optimum combustion time need to be 6 times/day

2 Smokeshaft outside diameter – – 300 to 400 mm

3 Fan power – – Need to not exceed 1.1 kw

4 Voltage – – 220V

5 Oil consumption – – Have to not surpass 14kg/h

6 Feeding door diagonal dimension (mm) – – Not less than 500mm 7 Incineration Temp. (⁰ C) – – 800 or above 8 Exhaust

Carbon Monoxide – – Must not go beyond 100 mg/m3

SO2 – – Need to not go beyond 400 mg/m3

HF – – (Hydrogen fluoride) Must not surpass 9.0 mg/m3

NO2 – – Should not exceed 500 mg/m3

Smoke dirt – – Need to not exceed 100 mg/m3

9 Elevation of the Burner – – Not much less than 10m over ground level

10 Maker’s Service warranty – – Not less than 1 year

11 Electrical Connection – – From closest circulation box using 25mm2 electrical cord and also all relevant connections and circuitry