Blog

Medical Waste Incinerator

Product Description

Waste Incinerator International Market Analytics 
Date. Jun. 10, 2012 
Download: Word format / PDF format 

Key Word: 
Small incinerators 
Medical waste incinerator 
Pet animal cremation incinerator 
Incinerator manufacturers 

Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As different circumscription, incinerator can be named many words as below: 

Treatment capacity: Small scale incinerator, large scale incinerator and incineration pant. 
Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators 
Incinerator fuel: Gas incinerator, oil incinerator 
Waste to Energy (WTE): WTE incinerator, non-WTE incinerator 
Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer. 
Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India) 
Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour 

Pyrolytic incineration technical is traditional waste treatment way for many years. All over the world, in many countries, people anti incinerator because the incinerator will produce a large Dioxin in the smoke. “Dioxins” refers to a group of toxic chemical compounds that share certain chemical structures and biological characteristics. Dioxins can be released into the environment through forest fires, backyard burning of trash, certain industrial activities, and residue from past commercial burning of waste. Dioxins break down very slowly and past releases of dioxins from both man-made and natural sources still exist in the environment. Anyhow, we have to remind that, this is large scale incineration pant, generally more than 30 ton per day. This is a social problem, to analyze and suggest ways in different angles from the public, government, economic development, environmental protection, technology development, etc. 

So, why we still use incinerator? 
First, for the medical waste from hospital, the pyrolytic incinerators is best treatment up to now. Pyrolytic technology can kill the virus, pollution control. 
Second, for human body, pet animal, in many countries and regions, we desire to cremation them. This is the ceremony in the process of society development, and ceremonies to commemorate the disappearance of life. 

As above two reason but not only above, we still use incinerators. 

How you can find reasonable incinerator for your local site? 
Incinerator is not a cheap equipment, generally the small scale model’s price around $5, 000USD per unit and large scale model’s price more than $50, 000USD per unit. So, before purchase one unit incinerator, small incinerator for medical waste china, small incinerator medical waste manufacturer, small incinerators medical, small natural gas trash incinerators, small scale incinerator china, you have to make clear following items: 
A, burn what? Incinerator is a incineration equipment, function is fire waste. So what kind of waste you want to treatment? 
B, small or large? This according to the waste output every day or the waste volume per feed time, like animal size. 
C, fuel? Incinerator use oil or gas fuel, generally, gas fuel is cheaper than oil and the smoke cleaner than oil fuel model. But some local site don’t have gas supply system. 
And other technology items, like power(220V, 380V), waste feed door type, incinerator structure, etc. 

After you clarify these, you can go to find a local or international manufacturers, asking prices, technical specifications and ultimately purchasing the right products. 

Wrote by Nicky

Items/Model YD-30 YD-50 YD-100 YD-150 Items/Model YD-200 YD-300 YD-500 YD-600 Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr. Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr. Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 360 900 1200 1500 Primary Chamber (Liters) 2000 2400 4000 5500 Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 200 200 500 500 Secondary Chamber (Liters) 500 1200 1500 1500 Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380 External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475 External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96 Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125 Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 200 300 300 500 Oil Tank(Liters) 300 500 500 500 Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81 Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128 Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 5 5 10 10 Chimney (M) 10 10 14 14 Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES Secondary Chamber  YES YES YES YES Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES Mix-Combustion Chamber YES YES YES YES Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES Smoke Filter Chamber YES YES YES YES Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES Temperature Monitoring YES YES YES

waste burner provider in china


  1. Burning rate: 250 Kg/hr.
  2. It should be able to Operate not Less than 10 hours/day
  3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
  4. Design Specification: Types A, B, C, D, and E of medical waste
  5. “PYROLYTIC” combustion, by controlling the gasification of waste.
  6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
  7. It should be able to reduce the volume of wastes by 98%.
  8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.

This burner with “PYROLYTIC” burning should have:

  1. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
  • The Temperatures of combustion:Minimum will be 850oC and max 1400oC
  • Post combustion: >1100o
  1. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter
  2. The Volume of the combustion chamber: Not Less Than 2.3 M³
  3. Burner operation should be Automatic On/Off
  4. Fuel : diesel, LPG, Natural Gas, Bio fuel
  5. The supplier must provide  necessary information for the best of  the installation

* Entirely limited door for the hand-operated loading of waste.The packing requirement to be Handbook, Set Lots,

  1. A combustion chamber of waste:

* A burner of lighting which the usage is limited to the ignition of waste.

* Make-up of the refractory;

* Burner of illumination of waste, with gas, conventional mono-bloc dispersing routing diving flame, lighting and safety of electronic ignition, permanent air flow, electromagnetic sluice entrance of standard and also isolating shutoff.

* A burner of burning of gases,

* A device of shot of air enabling a total recombustion of gases,

  • Refractory concrete :
    • . Thickness : ≥100 mm
    • . Nature: 42% of Al203
  • Insulate in fibrous panels :
    • . Thickness: ≥75 mm
  • Nature: Calcium silicate.

* A gadget of air inlet of air conditioning of waste gases,

* A sheath of emptying of the gases blistered.

  1. Load Method: Top Loading
  1. A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of shot of air enabling a complete recombustion of gases,

* A gadget of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases scorched.

* Carcass in solid sheet steel with support of connection.

* Composition of the refractory;

  • Refractory concrete :
    • Thickness : ≥180 mm
    • Nature: 65% of Al203
  • Insulate in fibrous panel :


laboratory incinerator china manufacturer

Solid waste to be incinerated

 

 

Cartons,  rags,  cotton  and  other  wastes  associated  with  generation  of  electricity loaded in the incinerator in

bags.

Loading capacity: At least 100 Kg / h

 

 

Start up fuel

 

 

Diesel Oil

 

 

 

2.3  Incinerator Supply

 

 

The incinerator shall be equipped with sludge pumps that allow homogenous flow of sludge to its burner. These pumps

shall deliver waste oil from the incinerator sludge mixing tank to the incinerator. Operation and control of these

pumps shall be fully automatic. A linear negative feedback control algorithm shall be used to adjust the feed rate of

the sludge pumps and hence vary the quantity of sludge being incinerated. The sludge line shall also be equipped with

appropriate self cleaning filter that will keep impurities away from the burner.

A  sludge  mixing  tank  equipped  with  a  superheated  water  heater  shall  also  be

provided. A Superheated water heater shall be provided to heat the waste oil to the inlet temperature required by the

incinerator. In case a superheated water heater

 

cannot be provided, an electric heater shall be provided for the tank. The tank shall also be equipped with a magnetic

level indicator, level switches and appropriate drain valves, separate overflow and vent pipes.

 

 

Characteristics of superheated water available at the power station are as follows; Pressure and temperature of

superheated water at supply manifold; P = 10 Bars, T = 150 Deg

Pressure and temperature of superheated water at return manifold; P = 8.5 Bars, T = 140 Deg

Precio de quema de 100-150kgs con segunda quema para uso en el centro de salud

Depósito de aceite con capacidad de 2000 litros

Artículos / Modelo

TS150 (PLC)

Imagen

Concepto

Tratamiento de incineración de residuos

Velocidad de combustión

Estándar 100-150 kg / hora

Capacidad de alimentación

Estándar 750 kg / alimentación

Modo de control

PLC (Incinerador de controlador de razonamiento programable)

Acero para texto

8 mm de espesor

Producto de la cámara

Pared de ladrillos refractarios con alto contenido de alúmina, 1750 ℃ Precio

Pintura para cara exterior

Tasa de 800 ° C

Cámara de combustión

1570L

Medidas interiores

El 150x100x105cm

Cámara adicional

750L

Cámara de filtro de humo

sí

Configuración de alimentación

Guía

Voltaje

210 / 230V 50 / 60Hz

Energía

0,9 kilovatios

Consumo de aceite (litros / hora)

Ordinario 14 (DO)

Consumo de gas (m3 / hora)

***

Pantalla de temperatura

Pantalla digital

Seguridad de temperatura

sí

Tanque de almacenamiento de aceite

300L

Puerta de alimentación

Los 80x60cm

Pozo de humo

10 metros

Tipo de chimenea

Acero inoxidable

1er. Nivel de temperatura de la cámara

800 ℃ –– -1000 ℃

2do. Nivel de temperatura de la cámara

1000 ℃ -1200 ℃

Tiempo de residencia

2,0 seg.

Peso bruto

8500 kg

dimensiones exteriores

300x160x280cm (sin humo)


Incineradores de residuos
Incinerador de desechos médicos
Cremación de animales domésticos
Residuo sólido   Incinerador

Tel: + 86-25-8461 0201
Móvil: + 86-13813931455 (whatsapp / wechat)
Sitio web: www.hiclover.com
Correo electrónico: [correo electrónico protegido]
Correo electrónico: [correo electrónico protegido]
Tecnología médica Co., Ltd. del trébol de Nanjing

ทำไมเราต้องใช้แผ่นกรองแผล?

22 พฤษภาคม 2019 Industry News 421 views

หลายคนไม่รู้ว่าฟิลเตอร์แบบพันรอบคืออะไร? ทำไมเราต้องใช้แผ่นกรองแผล?

เรามักจะได้รับสายเพื่อสอบถามเกี่ยวกับหลักการทำงาน การใช้สภาพแวดล้อม และวิธีการติดตั้งของขดลวดกรอง ดังนั้นในที่นี้ เราจะให้การแนะนำอย่างเป็นระบบแก่คุณเกี่ยวกับความรู้ที่เกี่ยวข้องและหลักการทำงานของตัวกรองไขลานอัตโนมัติ โดยหวังว่าจะ ให้ความช่วยเหลือแก่ผู้ใช้ที่มีศักยภาพซึ่งต้องการตัวกรองอากาศแบบไขลานอัตโนมัติของ Ecolead!  

  

แผ่นกรองม้วนอัตโนมัติ/แผ่นกรองม่านม้วนอัตโนมัติมีการใช้งานที่หลากหลายมาก ลูกค้าของ Ecolead จำหน่ายในเขตอุตสาหกรรมต่างๆ แบ่งคร่าวๆ ได้เป็น 2 ประเภทของการกรอง แบบแรกคือการกรองอากาศบริสุทธิ์ซึ่งกรองอนุภาคขนาดใหญ่ใน ระบบลมบริสุทธิ์ สาร เพื่อปกป้องคุณภาพของผลิตภัณฑ์ปลายน้ำหรือสิ่งแวดล้อม ปรับปรุงคุณภาพผลิตภัณฑ์ และปรับปรุงประสิทธิภาพการทำงาน เช่น การกรองอากาศบริสุทธิ์ในห้องเป่าลมของโรงงานอิเล็กทรอนิกส์ โรงงานผลิตยา โรงบำบัดน้ำเสีย กรองอากาศบริสุทธิ์ใน เครื่องปรับอากาศ, การกรองอากาศขาเข้าในโรงไฟฟ้า, กังหันก๊าซ, และหน่วยที่ต้องการการกรองขั้นต้น อุโมงค์, อุโมงค์, โครงการป้องกันภัยทางอากาศพลเรือน, ลานจอดรถใต้ดิน ฯลฯ ประเภทที่สองคือการกรองอากาศกลับหรืออากาศออก ระดับของก๊าซ มลภาวะในสภาพแวดล้อมประเภทนี้ค่อนข้างสูงและจำเป็นต้องกรองด้วยขดลวดกรอง การกรองด้วยถ่านกัมมันต์ ฯลฯ อนุภาคขนาดใหญ่ในก๊าซ สารพิษ และสารอันตราย เป็นไปตามมาตรฐานการปล่อยก๊าซที่รับรองโดยประเทศหรือป้อนกลับ ระบบอากาศ ตัวอย่างเช่น เครื่องปรับอากาศส่งคืนการกรองอากาศในโรงงานทอผ้า, การทำให้บริสุทธิ์ของระบบการเผาในอุตสาหกรรมโลหะ, การกรองก๊าซในอุตสาหกรรมการเคลือบ, การกรองการปล่อยก๊าซไอเสียในโรงงานเคมี ฯลฯ  

ลูกค้าตัวกรองคดเคี้ยวในปัจจุบันของ Nanjing Yixiou Co., Ltd. รวบรวมหลายสาขาเช่นผู้ผลิตเครื่องปรับอากาศ, โรงงานอิเล็กทรอนิกส์, โรงงานผลิตยา, โรงงานน้ำ, โรงงานเคมี, ผู้ผลิตรถยนต์และหน่วยงานก่อสร้างที่เกี่ยวข้อง, ผู้รับเหมาด้านวิศวกรรม, ซัพพลายเออร์ด้านวิศวกรรมคุ้มครองสิ่งแวดล้อม ,ฯลฯ ลูกค้าต่างๆ

URL เนื้อหาเพิ่มเติม: www.ecolead.cn โทร: 025-57138032

Crematorium Animal Equipment Diesel

Basic Info.

Model NO.:chinese industrial waste incineration
Export Markets:Global

Product Description

Waste Incinerator International Market Analytics 
Date. Jun. 10, 2012 
Download: Word format / PDF format 

Key Word: 
Small incinerators 
Medical waste incinerator 
Pet animal cremation incinerator 
Incinerator manufacturers 

Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As different circumscription, incinerator can be named many words as below: 

Treatment capacity: Small scale incinerator, large scale incinerator and incineration pant. 
Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators 
Incinerator fuel: Gas incinerator, oil incinerator 
Waste to Energy (WTE): WTE incinerator, non-WTE incinerator 
Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer. 
Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India) 
Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour 

Pyrolytic incineration technical is traditional waste treatment way for many years. All over the world, in many countries, people anti incinerator because the incinerator will produce a large Dioxin in the smoke. “Dioxins” refers to a group of toxic chemical compounds that share certain chemical structures and biological characteristics. Dioxins can be released into the environment through forest fires, backyard burning of trash, certain industrial activities, small waste incinerator, small waste incinerator manufacturers, small-scale medical incinerator, small-scale medical incinerators, smallest incinerator, and residue from past commercial burning of waste. Dioxins break down very slowly and past releases of dioxins from both man-made and natural sources still exist in the environment. Anyhow, we have to remind that, this is large scale incineration pant, generally more than 30 ton per day. This is a social problem, to analyze and suggest ways in different angles from the public, government, economic development, environmental protection, technology development, etc. 

So, why we still use incinerator? 
First, for the medical waste from hospital, the pyrolytic incinerators is best treatment up to now. Pyrolytic technology can kill the virus, pollution control. 
Second, for human body, pet animal, in many countries and regions, we desire to cremation them. This is the ceremony in the process of society development, and ceremonies to commemorate the disappearance of life. 

As above two reason but not only above, we still use incinerators. 

How you can find reasonable incinerator for your local site? 
Incinerator is not a cheap equipment, generally the small scale model’s price around $5, 000USD per unit and large scale model’s price more than $50, 000USD per unit. So, before purchase one unit incinerator, you have to make clear following items:
A, burn what? Incinerator is a incineration equipment, function is fire waste. So what kind of waste you want to treatment? 
B, small or large? This according to the waste output every day or the waste volume per feed time, like animal size. 
C, fuel? Incinerator use oil or gas fuel, generally, gas fuel is cheaper than oil and the smoke cleaner than oil fuel model. But some local site don’t have gas supply system. 
And other technology items, like power(220V, 380V), waste feed door type, incinerator structure, etc. 

After you clarify these, you can go to find a local or international manufacturers, asking prices, technical specifications and ultimately purchasing the right products. 

Wrote by Nicky

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

TECHNICAL INCINERATORS REQUIREMENTS FOR 2 health centers in Kenya


TECHNICAL INCINERATORS SPECS FOR 2 medical facilities

INTRO

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and
  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.
  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.
  • The Bidder shall supply and install the incinerator with the following attached specifications

           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
 

NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank requirement to be attached to the burner at a better level to make it possible for free-flow of diesel from the storage space tank to the burner.

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

EVALUATION STANDARD

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Analysis will certainly be performed in 4 phases particularly initial assessment of documents for uniformity with obligatory demands, technical assessment, website check out and additionally commercial exam.

100

Pass mark for technical analysis is 70/100 marks

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

Stage 3: Internet Site Browse With

The assessment committee will certainly check out the properties of the prospective purchasers who are receptive to technical evaluation stage to validate the credibility of legal documents sent out; establish the accuracy of the information offered in the tender documents, analyze firm’s capacity, area, to call a couple of.
LOCATION V– – TIMETABLE OF STANDARD

NO

NO

1

NO

1

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
 

The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

Hallmark of tenderer

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Note: In situation of variance in between system price as well as total quantity, the device price will control.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

AREA VI – – – – CONVENTIONAL FORMS

TECHNICAL INCINERATORS SPECS FOR 2 clinical centers

INTRODUCTORY

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

The container need to be affixed to the incinerator at a greater level to make it possible for free-flow of diesel from the storage tank to the burner.

 

EXAM CRITERIA

Analysis will be executed in 4 stages specifically preliminary examination of files for uniformity with required demands, technical assessment, site check out as well as likewise industrial exam.

100

Pass mark for technological evaluation is 70/100 marks

Phase 3: Web Site Browse Through

The assessment board will inspect out the properties of the potential buyers that are responsive to technical analysis phase to confirm the credibility of lawful data sent out; develop the accuracy of the details provided in the tender documents, analyze company’s ability, location, to call a few.

Phase 4 Company Analysis

ITEM

Quotes that pass the above 3 (3) phases will be contrasted on the basis of prices/ cost approximated and the most affordable valued will definitely be taken into factor to consider the cheapest analyzed proposal as well as additionally consequently suggested for honor.

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

NO

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

NO

 

1

   

Trademark of tenderer

Note: In case of inconsistency in between system cost and total amount, the unit rate will dominate.

SECTION VI – – STANDARD FORMS

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form


Эффективный выход воздуха

2019-05-13 Оборудование для очистки воздуха417 просмотров


Внедрение продукции

Сменные высокоэффективные воздуховыпускные отверстия EHB подходят для чистых помещений с неравномерным потоком воздуха с различными уровнями и конструкциями крыши. Высокоэффективная фильтрующая фурма EHB обладает надежной производительностью, компактной структурой, высокой универсальностью, удобной установкой и простым обслуживанием.Это разумный выбор для реконструкции и расширения чистых помещений.

Принцип работы:

Обычно устанавливается в конце системы подачи воздуха, чтобы подавать чистый воздух в комнату, чтобы снизить концентрацию пыли и обеспечить необходимые требования к чистоте.

Особенности продукта:

· Высококачественный лак для выпечки листовой холоднокатаной стали.

· Технологический процесс с более надежным уплотнением

· Более равномерная конструкция внутреннего воздушного потока

· Внутренняя и внешняя складывающаяся конструкция.

· Конструкция установки с верхней и боковой доставкой

· Круглые и прямоугольные формы интерфейса

Конфигурация продукта:

· Клапан регулировки расхода воздуха

· 10 мм изоляционный хлопок

· Фланец для впуска воздуха

· DOP, порт для проверки дифференциального давления  

Стандартный чертеж

Верхняя подача воздуха и высокоэффективная фурма

Высокоэффективная фурма с боковой подачей воздуха

 

Есть перегородки для подачи воздуха.

Нет выхода воздуха через перегородку

Нет выхода воздуха через перегородку

URL с дополнительным содержанием: www.ecolead.cn Тел: 025-57138032

00 BEDS HEALTHCARE CENTER INCENERATOR TECHNICAL INFORMATIONS


1) Policy

– – – – Incinerator:

It is developed to sanitize medical waste, lower its amount, and make its parts unrecognizable all in one completely confined as well as automated system.

2) Waste Disposal Plan

  1. a)Classification

The contaminated waste is filled up right into the leading stainless-steel chamber where a tough shredder reduces the waste into little items.

Infections Waste Specially-controlled waste Organ, needle, etc.
Industrial waste Rubber gloves, etc.
General waste Gauze, etc.
General Waste Plastic, Rubber Infusion bottle, etc.
Paper, wood, Vinyl Voucher, etc.
Metal, Glass Can, Glass bottle
  1. b) Infections Waste Disposal

Treatment cycle:

1- Filling up; the contaminated waste is automatically -loaded right into the chamber of the system

2-Shredding; the resilient shredder decreased the product right into little items as well as likewise includes an unique transforming about system to stay clear of obstructing

3-Heat; saturated pressurized hefty steam raises the temperature to 134 C and also the stress to 3 bar

4-Sterilization; the sanitation gets in straight phone call with the shredding material (134 c, 3 bar) for 20 minutes

5-Cooling; temperature degree is lowered to 80 C by splashing amazing water onto Double coat of the treatment vessel, concurrently, the unit returns to ambient pressure

6-Draining; the hefty vapor is compressed to water and also released with the cooling water to the hygienic sewer system

7-vacuum; the remaining recurring steam is vented out with an air pump

8-Unloading; an electronic signal informs the driver that all safe operating problems have been satisfied

The issue unlocks the gadget as well as also allows gravity unloading of the treated waste right into a container

Coach Spec

General Characteristics

8log 10

– – – – Incinerator:

It is established to sterilize professional waste, reduce its quantity, and also make its components indistinguishable all in one completely enclosed as well as automated system.

The infected waste is filled up right into the top stainless-steel chamber where a durable shredder lowers the waste into tiny products.

Therapy cycle:

1- Filling up; the contaminated waste is immediately -loaded into the chamber of the system

2-Shredding; the long lasting shredder decreased the item right into small pieces and likewise consists of an unique transforming about system to avoid obstructing

3-Heat; saturated pressurized heavy vapor increases the temperature to 134 C and the stress to 3 bar

4-Sterilization; the sterilization gets in straight call with the shredding material (134 c, 3 bar) for 20 mins

Operational temp. max 160 C
Max Weight when filld with waste For a special hydraulic test. Kg 10500
Stress. Kg/ cm3 3.5
Steam Pressure. Bar 8
Max Steam Flow Kg/h 500
Compressed Air Bar 6
Electricity 380 V/3 – phase Surge Protection system 35KW
Operating Characteristics
Average Cycle Time. minutes 60
Process Wight Capacity . Kg 500 – 600
Density. Kg/m3 100
Average process wight capacity Kg./cycle microbial inactivation 200-300

5-Cooling; temperature level is decreased to 80 C by spraying awesome water onto Dual coat of the therapy vessel, concurrently, the unit returns to ambient pressure

Waste volume reductin 80%
Consumption / Cycle
Steam. Kg 40
Electricity . KW/h 9
Water Liters 500


Hazardous Waste Camp Incinerator

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste can use in this equipment? 
A: This equipment for medical waste, pet animal, Municipal waste, live waste. Prohibit any explosive and radiation material, liquid waste and gas waste. 

Q: Incinerator Smoke Standard 
A: China Government Standard: No. GB18484-2001. 

Q: Treatment capacity 
A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not mean any waste material. The animal/pet combustion rate around 2/3 of average capacity. 

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time and time for feeding waste. Actual combustion time per day is around 16 hours. The lifetime of incinerator between 5-10 year according to use. 

Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour. When incinerator use in hospital, please calculate the waste output capacity around 2kgs per people per day. If there are 200 sickbed in the hospital, that’s mean you need one incinerator capacity around 400kgs per day, change to capacity per hour is around 30-40 kgs per hour. According the operation time per day, waste material, budget, development, etc, pet crematorium equipment for sale, pet crematory burner, pet crematory china, pet crematory incenterator, pet equipment china, pet incinerator cost, pet incinerators sale, you can use capacity from 30-50 kgs per hour incinerator. 
*How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Assembly and Testing 
A: We supply all documents and incinerators easy to installation and operation. Customer can send people come to our factory to learn installation and operation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order. 

Q: Combustion Temperature 
A: The first combustion chamber: 800-1000 centi degree. 
The second combustion chamber: 1000-1200 centi degree. 

Q: Incinerator Control Mode 
A: Default Control mode is common control case. PLC mode according to model and order. 

Q: Operation and maintenance costs 
A: Operation cost according to fuel consumption rate and power/staff, etc. 

Annual around $500-$1000USD per year maintenance according model, use situation. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm