Blog

Syringe and DestroyerNeedle Destroyer Needle Incinerators

Needle Incinerator: Melt the needle waste, cut off syring tube with needle, cut off the infusion tube.

Model SYC19, Price: $110usd/set, MOQ: 5 sets.

EXW factory term(donot including shipping cost)

Purchase email: [email protected]

1. For clinic,lab, small hospital with low waste output capacity, no condition with other medical waste treatment(Underdeveloped country or area, or emergency situations ).
2. Doctor, nurse treat the syringes, needle, infusion set immediately after use, plug to play, no dispersion risk.
3. melting the syringes needle with 1250Celsius high temperature to metal slag, sterilization immediately. Destroy syringes, infusion set, can not use again.

Qustion1: If request 1-4 set only, how to do?

Answer: We will plus $50-$200usd fee per order.

Qustion2: If request more than 5 sets only, any discount?

Answer: We will supply discount quotation accordingly.

how so i buy an incineration

you have to do custom clearance your side. and shipping document with bill of lading, invoice, packing list only. we have incinerator in PK and AFG but iam not sure where it is. all incinerator passed EU CE and ISO. if natural gas or LPG fuel, you have to contact with local gas supplier to know price, we only supply gas burner. if oil fuel, we supply oil system and oil tank already. installation, we assembly all we can do before leave and local working almost on chimney, control case, oil system as our indication guider on the machine. local site have to build a incineration operation house, simple type with concrete foundation.

by now, covid19, we support online or video guide and free cost.

medical waste trucks
waste incinerator tanzania
modern incineration technology
ready mace incinerator
the need for a hospital incinerator
incinerator for hazardous waste construction
manufacturers of fuel disposal in chaina

Small scale incinerator for hospital 5kgs 10kgs 20kgs and 30kgs per hour average

50 bed hospital proposal model TS5 or TS10 incinerator
200 bed hospital proposal model TS50 incinerator

we have more than 1000kgs per hour capacity incinerator.
How does a hospital incinerator work?
The incinerator comprises primary and secondary combustion chambers. The burning zone
of the primary chamber is accessible through a door at the front which lets in air and allows the operator to light the fire and remove the ash. The medical waste is dropped in through a loading door above the primary chamber.

How is hospital waste disposed of?
Two common methods of disposing of hospital-generated medical waste include incineration
or autoclaving. Incineration is a process that burns medical waste in a controlled environment. …
State regulations may mandate off-site incineration for certain types of waste.

The main purpose of any medical waste incinerator is to eliminate pathogens from waste and
reduce the waste to ashes. However, certain types of medical wastes, such as pharmaceutical
or chemical wastes, require higher temperatures for complete destruction.

Heavy duty firebrick for incinerator chamber

Heavy duty firebrick for incinerator chamber
55% of Al203
65% of Al203
75% of Al203


Tel: +86-25-8461 0201

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100 kg/hour 150 kg/hour 300 kg/hour 500 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

High Temperature Protection Gloves and High Temperature Protection Masks for incinerator operation

High Temperature Protection Gloves and
High Temperature Protection Masks for incinerator operation


Tel: +86-25-8461 0201

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]

how to incinerate aerosol spray
incinerator for sanitary napkins for schools
dial thermometer for incinerators
mobile incinerator medical waste
what are the costs and benefits of building a brick incinerator for hospital
drum inceniration

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100 kg/hour 150 kg/hour 300 kg/hour 500 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

All electrical connections attached with the incinerator and other machinery should
be provided with suitable and necessary safety devices and be protected by steel
conduits, cable trays, and supports. YES/NO
The manufacturer should permanently mark on the incinerator indicating: (i)
manufacturer’s name or trademark (ii) style, type, model or, date of manufacture
of the incinerator (iii) capacity in terms of net designed heat release in heat units per
timed period (i.e., British Thermal Units per hour, mega joules per hour, kilocalories per hour).
Operations store “The unit shall be supplied with a lockable operations store, that
shall be initially supplied with the following consumables:
• A first aid kit, suitable for addressing the hazards presented by the unit.
• 5 full sets of personal protective clothing and equipment.
• Operating logbooks.
• Unit cleaning equipment.
• Unit routine maintenance equipment and associated spare parts.
• Lubricants as appropriate.
• 3 Fire extinguishers.
• Any other consumables considered necessary by the Supplier.

Installation and Commissioning, Operator training, Spare parts package and Maintenance
Installation and commissioning The unit shall allow for easy and quick installation without
specialized tools/equipment and without high skilled manpower required, optimizing the
number of assembly/installation steps with separate items reduced to a practicable, shipment weight.
The assembly and installation process shall be designed to be reversible, to facilitate
rapid disassembling and re-packing without damaging the parts of the products itself.
All tools/equipment must be simple to use, of highest quality and meet international standards.
Team compositions and tools/equipment list/description shall be detailed in the
assembly, disassembly and Packing Manuals. Provision for the use of video weblinks
(in English with French and Arabic subtitles) showing the assembly process and,
separately, the disassembly process is required. Manuals are to be produced in English and French.

1. Medical waste incinerator – Small
2. Medical waste incinerator – Medium
3. General waste incinerator – Small
4. General waste incinerator – Medium
5. General waste incinerator – Large
5. General waste incinerator – Large with automated feeding system

Corrosion resistance and weather proofing The Incinerator units shall be designed
to last in operation in a tropical environment for a minimum period of 10 years if the
specified maintenance schedule is followed. All metal surfaces (except combustion
chamber internal fittings) shall be either galvanized, enameled, painted or otherwise
treated against atmospheric and process induced corrosion
The incinerator combustion chamber(s) should be designed for easy maintenance
of all internal parts including the refractory and insulation. Materials used in the
ndividual parts of the incinerator shall be heat resistance and also be protected
against oxidation, corrosion, etc.
The incinerator shell shall be made of mild steel with an adequate thickness
for small units of between 3-6mm and larger units 5-10 mm depending on the
construction part and painted externally with heat resistant aluminum paint
suitable to withstand 250° C. The outside surface temperature of the incinerator
casing should not exceed 50° C above ambient temperature and shall include a
safety mesh around all hot surfaces. Cold face refractory lining of calcium silicate
or superior material, minimum thickness 100 mm.
Combustion control system The incinerator units shall include a temperature
based electronic combustion control system that utilizes temperature and other
data to inform automated or programmed cycling through the standard burn
cycle: pre-heat, burn with waste addition, burn completion, cool-down. The
system shall be capable of varying auxiliary fuel and air supply in both combustion
chambers to achieve optimum combustion conditions. As far as practicable,
the incinerator shall be of a plug and play type for ease of installation and
commissioning in remote locations.
“The control system shall have a separate push button-based work station,
which shall be located adjacent to the loading bay and protected from weather
and impact damage. The system shall allow for rapid and straightforward intervention
by the operator if the automatic system is not achieving the desired results during a burn cycle.

Baltur Burner BT14GW for waste incinerator spare parts oil burner

Baltur Burner BT14GW for waste incinerator spare parts oil burner,
almost for incinerator capacity 50/100/150kgs per hour.
7.5-14.5kgs per hour
diesel oil fuel
0.13Kw
16kgs per set


Tel: +86-25-8461 0201

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100 kg/hour 150 kg/hour 300 kg/hour 500 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

Advantages of incineration

Advantages of Waste Incineration

Decreases Quantity of Waste. …
Efficient Waste Management. …
Production of Heat and Power. …
Reduction of Pollution. …
Incinerators Have Filters For Trapping Pollutants. …
Saves on Transportation of Waste. …
Provides Better Control Over Odor and Noise. …
Prevents the Production of Methane Gas.

NCV Incinerator NGV Incinerator

What is incineration and why it is useful?
Incineration is also called as combustion. … Important use of incineration is that it reduces volume of
waste by 20-30% of original volume. This process is also known as thermal treatment where solid waste materials are
converted by Incinerators into heat, gas, steam and ash.

Do all hospitals have incinerators?
Two common methods of disposing of hospital-generated medical waste include incineration or autoclaving. Incineration is a process that burns medical
waste in a controlled environment. Some hospitals have on-site incineration technology and equipment available.

How do hospitals dispose of placentas?
Hospitals treat placentas as medical waste or biohazard material. The newborn placenta is placed in a
biohazard bag for storage. … Once the hospital is done with the placenta, it is put on a truck with all the
other medical waste accumulated at the hospital for proper disposal

incineration of sewage sludge
possible solution to get rid of medical waste in oman
irradiation of medical waste
incinerator repair and service
household waste incinerators in india
explanation on incineration in health centre
ensnertor technician

Nanjing Clover Medical Technology Co.,Ltd.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour 50-100 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100-150 kg/hour 150-200 kg/hour 300-400 kg/hour 500-600 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

The Contractor shall deploy an expert incinerator operator, fully equipped with all required tools and equipment, to support the client in un-packing, installation, and commissioning of the different sizes of incinerator units.
The operator will be provided on a day-rate reimbursable basis. The bidder must specify the minimum scope of work in terms of operator working days and travel days.
Rates for these to be provided on the financial offer form.
All associated fittings and connections to enable full functionality shall be completed by the bidder in line with the manufacturer’s
instructions; including but not limited to piping, electrical and stack connections, foundations, anchorage to foundations, etc., as applicable
“Handover of the unit
The Contractor shall hand over ownership and control of each size of unit to the client after the first 5 days of supervised operation.
The handover process shall include a detailed inspection and completion of a checklist and statement of operability.
”
“Decommissioning, overhaul and repacking of the unit
Based upon a potential need for an incinerator unit to be moved to a new location the contractor will outline the key steps through a
clear written procedure and direct demonstration by the contracted operator for the decommissioning and repacking of the units, so this can be achieved.

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Medical Waste Incinerator & Auto Roll Air Filter(Air Purification)

Mobile: +86-138139 31455(WhatsApp)

Website: www.hiclover.com
Email: sales
Email: hicloversales

What are the objectives of incineration?

What are the objectives of incineration?
Incineration plants produce heat and power from waste, reduce waste disposal to landfills, and discharge
harmful emissions and bottom ash. The objective of the incineration plant is to maximize desirable outputs
(heat and power) and minimize undesirable outputs (emissions and bottom ash).

What is incinerators used in hospitals?
Medical incinerators are designed safely to dispose of harmful materials at high temperatures. The process
ensures no harmful gases are released into the environment. Medical waste incinerators have scrubbers to
clean the polluted gases and other particulate matter.

Which is better landfill or incineration?
Its director Jacob Hayler told us: “It is better to recover energy from non-recyclable waste through (incineration), than send it to landfill.” … Mr Hayler says that overall greenhouse
gas emissions from incineration are lower than from landfill.

How does incineration affect our environment?
Pollutants emitted by incinerators that appear to have the potential to cause the largest health effects are
particulate matter, lead, mercury, and dioxins and furans. However, there is wide variation in the contributions
that incinerators can make to environmental concentrations of those contaminants.

Nanjing Clover Medical Technology Co.,Ltd.
temperature required for body parts incineration
incinerator for clinical
methods of waste management
haat incinerator india
contact number for hazardous waste management companies in kumasi
https www pvc org en p pvc incineration dioxins
disposal of clinical waste
Suitably designed pollution control devices such as scrubbers, filters or electrostatic precipitators, shall be
installed/retrofitted with the incinerator to achieve emission limits.”
“Each unit shall include a complete vertical exhaust and stack system, including the following features:
• Steel construction.
• Refractory lining in the lower section.
• The exit height of the stack shall be not less than a range of 3-12 metres above ground level depending on
the capacity of the incinerator unit.
• The diameter of the stack shall be selected by the Contractor to deliver an exhaust exit velocity of not less
than 10 metres per second vertically upwards when at full scale operation.
• An emission stack sampling port shall be included immediately above the secondary chamber.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10-20 kg/hour 20-30 kg/hour 30-50 kg/hour 50-100 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100-150 kg/hour 150-200 kg/hour 300-400 kg/hour 500-600 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

4.5.2 If the Contractor is not the original manufacturer of the goods, the Contractor shall provide UNOPS with the benefit of
all manufacturers’ warranties in addition to any other warranties required to be provided under the Contract;
4.5.3 The goods are of the quality, quantity and description required by the Contract, including when subjected to conditions
prevailing in the place of final destination;
The goods are free from any right of claim by any third-party, including claims of infringement of any 4.5.4intellectual property
rights, including, but not limited to, patents, copyright and trade secrets;
4.5.5 The goods are new and unused;
4.5.6 All warranties will remain fully valid following any delivery of the goods and for a period of not less than one (1) year following
acceptance of the goods by UNOPS in accordance with the Contract;
4.5.7 During any period in which the Contractor’s warranties are effective, upon notice by UNOPS that the goods do not conform to
he requirements of the Contract, the Contractor shall promptly and at its own expense correct such non-conformities or, in case of its inability to do so, replace the defective goods with goods of the same or better quality or, at its own
cost, remove the defective goods and fully reimburse UNOPS for the purchase price paid for the defective goods; and,
4.5.8 The Contractor shall remain responsive to the needs of UNOPS for any services that may be required in connection
with any of the Contractor’s warranties under the Contract.

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Medical Waste Incinerator & Auto Roll Air Filter(Air Purification)

Mobile: +86-138139 31455(WhatsApp)

Website: www.hiclover.com
Email: sales
Email: hicloversales