contaminated materials high temperature burners for the treatment of contaminateds materials. The waste will definitely be blended, including medical, oily wastes, woods as well as lab wastes. Key burning
Diesel/LPG/LNG burning primary burning chamber/primary burning location
Extra burning
House time in the second chamber very little less than 2 secs
Both primary and also the second temperature level degrees protected till all the waste has actually been entirely combusted
Chimney
Smokeshaft with a minimal altitude of 4 meters above ground level
Minimum leave rate of the discharges not less than 10 metres/second
Temperature level Cautions
Unique and/or obvious alarm to caution the vehicle driver when the additional temperature degree drops to below the called for temperature level
General
Control box that can be separated and positioned on separate stand at the very least 1.5 meters from incinerator at around 1.6 meter height
Burner variation A.
Burn Price 65kg/h minimum.
Weight (kg), please suggest:.
Second Chamber.
Gas Retention Time – – – – 2 Seconds. Power Supply – for – Control Box – 220V-240V 50Hz solitary phase.
10m Tube Pipeline, suggest size. I000 Litre Gas Container+ Pipeline System, show volume. Included smokeshaft expansion
, indicate elevation. Service warranty, recommend no of years
Heater style B. Burn Price 150kg/h minimum.
Gas Retention Time – – 2 Secs. Diesel/LPG/LNG, please indicate. Minimum operating temperature level 920 ° C, please suggest.
10m Pipeline Pipeline, show dimension. I000 Litre Gas Container+ Pipe System, reveal quantity. Extra smokeshaft growth, show elevation.
Guarantee, reveal no of years
Heater variation C.
Burn Rate 250kg/h minimum.
Weight (kg) please indicate:.
2nd Chamber.
Gas Retention Time 2 Secs.
Fuel Diesel/LPG/LNG, please program.
Power Supply for Control Box 220V-240V 50Hz solitary phase.
Minimum running temperature 920 ° C, please show.
One year Spare Parts Package for total maintainability.
10m Tube Pipe, recommend length.
I000 Litre Gas Container + Pipe System, reveal amount.
Added smokeshaft growth, reveal elevation.
Service guarantee, suggest no of years
Whole lot 4– – High Temperature Waste Incinerator.
HTW Incinerator layout D. Burn Cost – – 150kg/hour minimum.
Weight (kg), please show:.
Additional Chamber.
Gas Retention Time 2 Seconds.
Gas Diesel/LPG/LNG, please indicate.
Power Supply for Control Box 220V-240V, single stage 50-60Hz.
Minimum operating temperature level 1200 ° C, please show.
One year Spare Elements Plan for overall maintainability.
10m Hose pipe Pipeline, show length.
1000 Litre Gas Storage Tank + Pipe System, suggest volume.
Additional smokeshaft development, suggest elevation.
Service warranty, reveal no of years
Great deal 5– – Mobile Burner.
Mobile Incinerator version E. Burn Price 50kg/h minimum. Weight (kg), please show:.
Gas – Retention Time – – 2 Seconds. Gas – Diesel/LPG/LNG, please show. Minimum running temperature level 850 ° C, please suggest.
Assurance, suggest no of years
Lot 6– – Mobile Incinerator.
Mobile Heater design F. Burn Price 100kg/h minimum. Weight( kg), please recommend:.
Extra Chamber.
Gas Retention Time – – – – 2 Secs. Gas – Diesel/LPG/LNG, please suggest –. Power Supply – for – Control Box – 220V-240V 50Hz single stage. Minimum running temperature 850 ° C, please suggest. One year Spare Elements Package for full maintainability.
10m Tube Pipe, suggest length.
1000 Litre Fuel Storage Tank + Pipeline System, suggest quantity.
Additional smokeshaft growth, suggest altitude.
Assurance, show no of years
Good deal 7– – Heat Waste Mobile Burner.
HTW Mobile Incinerator style G.
Burn Rate 100kg/h minimum.
Weight (kg), please indicate:.
2nd Chamber.
Gas Retention Time – – – – 2 Secs. Gas – Diesel/LPG/LNG, please indicate. Power Supply for Control Box – – – – 220V-240V 50Hz solitary stage.
Minimum operating temperature 1200 ° C, please show.
One year Spare Parts Prepare for total maintainability.
10m Tube Pipeline, suggest size.
1000 Litre Gas Tank + Pipe System, show amount.
Additional chimney extension, recommend altitude