Tag: incinerate

INCINERATEUR DE DECHETS HOSPITALIER

INCINERATEUR DE DECHETS HOSPITALIER SPECIFICATIONS TECHNIQUES. Capacité destructive de 55 Kg/h jour de déchets hospitaliers  avec un p .c. i jusqu’à 3.200 Kcal/Kg 1)Type de déchet                                                                                               hospitalier 2)Pouvoir calorifique inférieur                                                                        3.200 kcal/kg 3)Humidité                                                                                                          20% 4)Teneur  en cendres et/ou inertes                                                                       8% 5)Capacité destructive nominale                                                                         55 kg/h 6)Volume chambre de combustion                                                                     1,65 m³ 7)Volume chambre postcombustion                                                                   2.1 m³ 8)Temps  transit des fumées en post combustion /sec.                                       <2 9)Température minimale  en postcombustion                                                     1.100° C 10)Teneur d’oxygène libre en postcombustion                                                     6% 11)Attribution refuse confectionné en sachets                                                     HDPE 12)Dispositif de chargement : hydraulique ; capacité de charge                           0.5 m³                                                      13)Combustible prévu                                                                                           Gasoil 14)Brûleur en chambre de combustion                                                                  nbr : 1  15)Brûleur en chambre de postcombustion                                                           nbr : 2  •   The site is surrounded by an iron fence (sheet metal) 3 meters height from the surface of the earth in order to protect the incinerators from dust storms  •    The iron fence must have a 5 meters Width gate  •    Automatic anti-rust and heat electrical circuit must be provided  •    The furnaces are highly efficient, emissions-free, safe, and environmentally friendly and have capacity of not less than 3,000 kg of materials and the rate of burning at least 400 kg / h •    The method of feeding the furnace through a side slot or from the top and the emission of the smoke is completely prevented. •    a furnace Must have two rooms, one of them is the  main room of not less than the “5” stoves to the process of burning materials and other secondary room of not less “2” stoves to burn resulting gas from the first process as well as the chimney •    The main component of the body of the furnace is stainless steel box, the thickness of not less than 7 mm with a layer of zinc phosphate plated with aluminium reflector to heat CONSTITTUTION DE L’APPAREIL.

Small Medical Waste Incineraotr for COVID-19 Bio Hazardous Medical Waste

HICLOVER – Medical Environmental  Model YD-20 Picture Burning Rate Average 20 kgs/hour Feed Capacity Average 60 kgs/feeding Primary Combustion Chamber 360 Liters Secondary Combustion Chamber 200 Liters Mix Combustion Chamber Yes Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 1.0 Kw Fuel Type Diesel Oil/ Natural Gas/LPG Burner Italy Original Oil Consumption (Diesel […]

Supply, Installation and commissioning of Waste Incineration system

De manera atenta solicito me colabore con la cotizacion del incinerador incluyendo envió.Puri group a hospitality business in Indonesia is interested to introduce renewable energy in Indonesia or to use the energy sources for its facility around Indonesia. Kindly request to have more information on incinerator technology as it is needed to process 100 ton […]

The Incinerator Plant Scope of Work

The Incinerator Plant is output wastes incineration from Different petrochemical units. In this project we want to incinerate all output wastes from petrochemical units and also produced high pressure steam from incinerator plant heat generated. At first output waste from petrochemical collects and transfers to transit and sorting center in various forms. Input feeds of incinerator plant are shown in below table: Waste streams of petrochemical unit collect and store in Transit and Sorting Center. In Transit and Sorting Center one laboratory must be considered. In this center, waste will be classified in two groups: – Unsuitable for burning – Suitable for burning Unsuitable waste for burning can be divided into the 4 categories: – Buried materials – Materials (wastes) that need to be stabilized before buried – Materials (wastes) that can be sold. – Wastes that can be returned to petrochemical. Suitable wastes are classified into the two categories: – Input wastes to rotary kiln, consist of solids and waste fluids. – Input wastes to static kiln, consist of clean fluids and gasses. All solid wastes must be transferred to storage pit from Transit and Sorting Center. Solid wastes storage pit is input of rotary kiln. All fluid wastes must be stored and stabilized in Transit and Sorting Center. All storage and stabilization devices or facility must be considered. Storage and stabilization devices (facility) consist of: Tanks, Pumps (Transfer, Loading & Unloading), Agitator (Mixer), Blanketing System, Flare system, Instrumentation and Control Systems, etc Storage and stabilization capacity must be considered based on worst case (shut down). Generally incinerator plant consists of two similar trains (capacity of each train is 100%). Each train consists of a rotary kiln and a static kiln. Based on client request, efficiency of incinerator plant is 99.8% for all components and for aromatic must be higher than that amount. Please be attention, produce high pressure steam from output heat of incinerator plant is in this scope of work.

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2019年9月27日 www.imcha.net GPs Warn Against Medicine Waste As Pill Packet Photo Goes Viral HuffPost UK In response to the photo, Dr Kenny Livingstone, a registered GP and chief medical officer of ZoomDoc, told HuffPost UK that medication wastage is a … 标记为不相关 Cell selection algorithm turns medical waste into treatment […]

Newsletter – waste incinerator

waste incinerator 每天更新 ⋅ 2019年9月25日 www.imcha.net Corby incinerator: Northamptonshire County Council approves plans BBC News Plans for an incinerator at a former steel works have been approved despite objections from nearby heritage sites, schools and a council. 标记为不相关 Marion County gives trash burner another year to win state tax credits Pamplin Media Group Marion County […]

Waste Incinerators

10.A ready built fabricated room shall be supplied for housing the incinerator. The room will be designed in such a way that free space is  available  on all sides and heat radiation  kept at minimum and giving the operators an easy workable environment and ventilation. The materials will be sufficient structural thickness of mild steel angles neatly coated with metal primer and epoxy paint to withstand sea corrosion  Smoke less burner unit with all accessories: -Oil flow rate range (100-2500) B/D. -GOR range (200-1000) SCF/D. -API range (14-30). -AIR supply: pressure (50-150) psi, flow rate (350) ft3/min. -Water supply: maximum pressure (300) psi, flow rate water (1800) B/D. -Pilot light: propane gas or gas & oil. -Ignition: supply (400 V, 3 phase +N +T, 50 Hz) & (work at 55 c). -Rotation device: one swivel joint allowing rotation of (75) each side of boom center line. -Connections: (oil 2 in-L.P.) & (air 2 in-L.P. equipped with WECO hammer union fig. 602 – (water 2 in-L.P. equipped union fig. 602). -Pilot gas 1/2 in-L.P. •    Installing a readymade concrete base (Precast) with Height 30 cm above the ground and 20 cm below the surface of the earth.  •    The dimensions of the base are increased by (2 meters) from the edge of incinerators  •    The rest of the accessories in all the trends even allows the worker directly feeding and maintenance work, cleaning and move easily taking into account the tendencies of the base toward the door for drainage of water. •    The floor coating must be high-quality epoxy paint. •    Install anti-rust and heat Umbrella of brick and steel (pyramid shape) of (5) meters height above the ground which installed with the edge of the concrete base by thick galvanized columns  •    This umbrella Cover the site furnace and allow bringing the chimney •   The site is surrounded by an iron fence (sheet metal) 3 meters height from the surface of the earth in order to protect the incinerators from dust storms  •    The iron fence must have a 5 meters Width gate  •    Automatic anti-rust and heat electrical circuit must be provided  •    The furnaces are highly efficient, emissions-free, safe, and environmentally friendly and have capacity of not less than 3,000 kg of materials and the rate of burning at least 400 kg / h •    The method of feeding the furnace through a side slot or from the top and the emission of the smoke is completely prevented. •    a furnace Must have two rooms, one of them is the  main room of not less than the “5” stoves to the process of burning materials and other secondary room of not less “2” stoves to burn resulting gas from the first process as well as the chimney •    The main component of the body of the furnace is stainless steel box, the thickness of not less than 7 mm with a layer of zinc phosphate plated with aluminium reflector to heat •     the thickness of the door of 150 mm and a hardness of not less than 170 kg / m 3 to be burnt, automatic comprehensive remote system. •    Furnaces must be destructive enough to burn and incinerate the material which mentioned previously  •   furnaces must have certificates are supported global enterprises and government competent for environmental protection In the country of origin or the General Presidency of Meteorology and Environment Protection in Saudi Arabia •    The oven can work for 24 hours so as to allow for the burning of materials for a period of not less than 12 consecutive hours and the remainder for cooling and provides full fuel tank with a capacity of 1000 L to turn on the oven. •    Must have an automatic ignition and diesel is used •    a furnace has the ability to withstand extreme temperatures up to “130o c And also, it guarantees continuous operation of which can be utilized for 24 hours with the ability to remove residues during the work of the oven, Insulating layer of calcium must be present in the rooms with Thickness not less than 50 mm and a wall thickness of 100 mm  •    Isolation of burning room: the space between the walls& nbsp;must be of the “stainless steel”. In addition, burn room must fill with Thermal insulation material. •    Ensure that the combustion of materials emitted in the secondary room should be at least two seconds period and the room is lined with high-density ceramic fibbers •    Incinerators must contain a system for processing (purification) gasses before emission of the smoke. •     Incinerators must have the capacity of self-cooling after the end of the daily operating period. •    Incinerators must have chimney not less than “4 meters” height from the surface of the oven, also, it must be thermally insulated and non-rust able, and must also be removable, installation and tide default. •    Electrical capacity required “220/ 380-volt “60 hertz •    Incinerators must be fitted with a control panel of the electronic keys to monitor all the necessary indicators of activation keys, as well as start-up and switch off so as to be isolated inside a metal box with the presence of the following: Alarm Sensor in the event of (crashes “burner” or purification device or heat leakage       or internal connections and wiring) Monitors for the temperature of the rooms Aerosols Filter indicators/ monitors Room temperature sensors  Indicators for furnaces and index overload Timer for Extinguish the oven automatically depending on the time required.  •    All equipment must be highly resistant to external conditions such as high temperature (50oc)  •    All doors must have special lock are not allowed non-persons appointed to work. •    Providing fire extinguisher for each site with a capacity of 10 kg at least 9.Metal fuel tank from black steel (capacity not less than 2500 litres) and shall be installed at the incinerator Room. The tank shall be provided with all necessary fittings including fill, vent, drain and overflow line, level indication and access for inspection and maintenance. Level switches shall be provided for the following services.              (a) Low level alarm             (b) High level alarm              (c) Low level start of transfer pump              (d) High level stop of transfer pump

multiple diesel fuel combustion chambers Incinerator

*External diameter at base 6ft 1.8m *External diameter at top 4 1/2ft 1.35m *Internal diameter at base 3ft 0.9m *Internal diameter at top 3ft 0.9m *Thickness of wall at base 18cm *Thickness of wall at top 9cm *Perpendicular height of wall 4ft *Height of Iron bars from grate above ground 1ft Material Required *Puddle swish *5 or 6 Iron bars about 4 1/2ft 1.35m long each *Quantity of large stones for foundation  *2 empty kerosene tins for making vent holes *2ltrs of coal tar *2 brushes *Foundation 1ft-1 1/2ft deep is dug *Filled with large stones and puddle swish to ground level  *Empty kero tins are next placed into position where the vent holes are to appear *Wall 1ft high is built with puddle swish *Iron bars are put in position leaving a space of about 2cm-3cm between the bars 4ft 1.2m to be reached *Wall plastered smooth  multiple diesel fuel combustion chambers Performance capacity 120kg/hr GRE 1.25 for HCRW 96kg/hr GRE 1.25 for general waste. 40kg/hr GRE 3.00 for plastic Waste type: health care risk waste and general waste Chimney stack Chimney: 3.5mm mild steel Height from base: 11m and if there are buildings within 30m of the incinerator, chimney must extend at least 3m above the apexes of all the roofs of such buildings Diameter of chimney at top: 430mm Weight of stack: ± 500kg case and stack be painted with 400 °C heat resistant black paint Burners 1st chamber 850 oC -900oC 2nd chamber 1000oC Variable speed combustion air blowers Primary chamber volume ±1.05 cubic metres Mixing chamber volume ±0.30 cubic meters Settling chamber volume ±0.89 cubic meters Weight excluding chimney ±6 400kg at manufacture Firing tools supplied: Hoe, poker and rake Dimensions Length ±2 125mm Width ±1 890mm Height  ±2 125mm Extra width for burners ±1 000mm Loading door opening 610mm×540mm Hearth area ±1.19 square metres Description of grate/hearth: A full hearth to be supplied to prevent contaminated  liquids  from  flowing  into  ash  pit  without  being […]

Design standard Multiple chamber incinerator

Waste type organics domestical  waste Calorific value of waste 9,25 MJ/kg Ash content 20.80 % Density 291 Kg/m3 Waste quantity (kg per hr) 12,500 Total Heat input (Gcal/hr) 23.71 organics domestical  waste Solid Domestic waste, after separating the recyclable, such as: plastic, cloth, metal, paper, wood, glass, stones, etc. than larger 10 cms Design standard Multiple chamber incinerator to the design of EPA  standards, Air pollution control Description of the Chimney Top mounted, self supporting Incinerator performance 150kg/hr Refuse  Hospital waste and carcasses Recommended Temperatures Minimum 1000⁰C Dimensions: Length  Width  Height  Extra width for burners At least 3000mm Loading door opening Minimum 700mm x 600mm Hearth area 5.00square meters Description or grate/hearth A full hearth supplied to prevent contaminated liquids from flowing into the ash pit without being incinerated Primary chamber volume At least 3 cubic meters Mixing chamber volume At least 1 cubic meters Settling chamber volume At least 3 cubic meters Weight excluding chimney 15, 000kg at manufacture Firing tools supplied Hoe, Poker and rake

200 BEDS HOSPITAL INCENERATOR TECHNICAL INFORMATIONS

1) Policy – Waste disposal management shall be taken special note to prevent hospital infection. – Infections wastes shall be managed, stored strictly and burned by a incinerator located at hospital site.   2) Waste Disposal Plan a) Classification – Medical wastes in hospital are classified as follows;   Infections Waste Specially-controlled waste Organ, needle, etc. Industrial waste […]