Tag: incinerators

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2019年10月1日 www.imcha.net Environmental Health And Safety Management Market Size, Share, Development by 2024 Bishop’s Cleeve Bulletin (blog) Environmental Health And Safety Management Market Segmented by Types: Medical & Pharmaceutical Waste Management , Industrial Waste … 标记为不相关 查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification) Newsletter。 | […]

Incinerator with Movable platform & Auto. Door and Design for Pets Human Cremation Business

Design for Pets Cremation Business Movable platform & Auto. Door Independent Position for Small Pet Incinerator with Movable platform & Auto. Door and Design for Pets Human Cremation Business Model A1500 Picture Burning Rate Average 150 kgs/hour Feed Capacity Average 350 kgs/feeding Primary Combustion Chamber 1500 Liters Secondary Combustion Chamber 500 Liters Mix Combustion Chamber Yes […]

Smallest Incinerator 30kgs

Average 30kgs per hour ***Primary chamber(200Liters) *** Secondary chamber *** Mix combustion chamber *** Stainless steel chimney(1meter) *** Italy made oil burner(2sets) *** Dry Scrubber *** Weight 1.7T(can reduce to 1.0Ton) Main Spare Parts(Standard for incinerator, and price include already): *** 2 sets Italy Oil Burner *** 2sets Temperature Probe *** 1 set Control Case […]

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2019年10月1日 www.imcha.net TerraCycle reports boosted sales and income numbers Resource Recycling This segment manages regulated, universal and hazardous wastes, including lamps and bulbs, batteries, scrap electronics, organic waste, medical … 标记为不相关 查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification) Newsletter。 | 以RSS Feed的形式接收此快讯 发送反馈

Smallest Incinerator 30kgs

Average 30kgs per hour ***Primary chamber(200Liters) *** Secondary chamber *** Mix combustion chamber *** Stainless steel chimney(1meter) *** Italy made oil burner(2sets) *** Dry Scrubber *** Weight 1.7T(can reduce to 1.0Ton) Main Spare Parts(Standard for incinerator, and price include already): *** 2 sets Italy Oil Burner *** 2sets Temperature Probe *** 1 set Control Case […]

Medical Waste Incinerator for Coronavirus Disease(COVID-19)

* Full range incinerator with Standard Small-Large Scale incinerator, General Municipal Solid Waste Incinerator, Containerized Mobile Incinerator, High Efficient Environmental Waste Incinerator. * Single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators. * System solutions for medical waste environmental. * High burnning rate, from 5kgs to 1000kgs per hour. * […]

Newsletter – medical waste

medical waste Medical Waste Incinerators ⋅ 2019年10月1日 www.imcha.net Hankins Consulting Announces Portfolio Addition of a Dermatopathology Lab in Westerville, Ohio PRNewswire (press release) … source of passion I bring to all of my businesses including CarePath Diagnostics, CDB Energy, BioSafe Supplies, and Steri-Green Medical Waste. 标记为不相关 查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll […]

Incinerators QA

Q: what is kind of waste can use in this equipment? A: This equipment for medical waste, pet animal, Municipal waste, live waste. Prohibit any  explosive and radiation material, liquid waste and gas waste. Q: Incinerator Smoke Standard A: China Government Standard: No.GB18484-2001. Q: Treatment capacity A: Average Capacity calculated by medical waste(lower calorific power (L.C.P): 3.0TH Kcal/Kg per hour),  not mean any waste material. The animal/pet combustion rate around 2/3 of average capacity.   Clover incinerator use time per day up to 24 hours. Between each feed/combustion time,  there are about 0.5-1 hours cooling time and time for feeding waste. Actual combustion  time per day is around 16 hours. The lifetime of incinerator between 5-10 year according to use.  Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour.  When incinerator use in hospital, please calculate the waste output capacity around 2kgs  per people per day. If there are 200 sickbed in the hospital, that’s mean you need one  incinerator capacity around 400kgs per day, change to capacity per hour is around 30-40 kgs  per hour. According the operation time per day, waste material, budget,  development, etc, you can use capacity from 30-50 kgs per hour incinerator. *How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. Q: Assembly and Testing A: We supply all documents and incinerators easy to installation and operation. Customer  can send people come to our factory to learn installation and operation. Generally,  We do not send engineer to local site if not request. The dispatch cost is extra according to order. Q: Combustion Temperature A: The first combustion chamber: 800-1000 centi degree. The second combustion chamber: 1000-1200 centi degree. Q: Incinerator Control Mode A: Default Control mode is common control case. PLC mode according to model and order. Q: Operation and maintenance costs A: Operation cost according to fuel consumption rate and power/staff, etc.  Annual around $500-$1000usd per year maintenance according model, use situation.  One person can service 02 unit incinerators. The staff should have basic electrician  knowledge to operate/inspect/maintaince incinerator/burner/blower according to  operation user guider, and know risk of medical waste to protect worker self with necessary protection element. Q: The Residency time in secondary combustion chamber A: 02 sec. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201    Mobile: +86-13813931455(whatsapp/wechat) Website: www.hiclover.com   Email: [email protected] Email: [email protected]   Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn […]

Melt blown Production Line 400mm and 1600mm and ES Fiber Production Line and N95 Mask Machine and Disposable Mask Machine

1. N95 and Disposable Mask Machine   2. 400mm and 1600mm Melt blown Production Line 3. ES Fiber Production Line       N95 Face Mask Machine Production Line Melt blown Production Line   A.)Optional Capacity: 1600mm Efficiency: 95-97% FOB Term Price: USD per set Price Valid: 5days. Ave.60 Days ready for shipping. In stock […]

Top Feeding Door HICLOVER 10-500kgs/Hr.Double Combustion Chambers Waste Incinerators

Phone: +86-13813931455(whatsapp/wechat)Website: http://www.hiclover.com/  Email: sales@hiclover.com Email: hicloversales@gmail.com   Nanjing Clover Medical Technology Co.,Ltd. HICLOVER is now offering a full range of medical waste incinerators, designed to provide efficient waste destruction, utilizing best available technologies and environmentally friendly process. Due to the secondary chamber with its 2 second retention period, our medical incinerator range is well suited to process medical waste.   Our products […]