chemical agents to be utilized: 10% heptyl (unsymmetrical dimethylhydrazine) water solution, heptyl (unsymmetrical dimethylhydrazine) vapour with 0.8 to 1.0 kg/m3 concentration, 10% azotic (nitric) acid water solution, azotic (nitric) acid vapour with concentration up to 1.1 kg/m3; 2. neutralization method: thermal decomposition; 3. neutralization temperature: +800?C to +1200?C; 4. performance: ? vapour capacity: 70 to […]
Tag: incinerators
HICLOVER Incinerator mobile small With Wheel and Brake
Model YD-30 Mobile Type Picture Burning Rate Average 30 kgs/hour Feed Capacity Average 60 kgs/feeding Chamber Main Body Stainless Steel Mobile Function With Wheel and Brake Primary Combustion Chamber 280 Liters Secondary Combustion Chamber 150 Liters Mix Combustion Chamber Yes Feed Mode Manual Voltage 220V Power 1.5 Kw Fuel Type Diesel Oil Burner Italy […]
Large Capacity Animal Pet Cremation HICLOVER Model A1500 with E-Power Auto. Door
Large Capacity Animal Pet Cremation HICLOVER Model A1500 with E-Power Auto. Door Model A1500 Internal Dimensions 150 x 100 x 96cm Suit for Animal Cat – yes Dog – yes Pig – small Cow – small Main Product List Primary Combustion Chamber Secondary Combustion Chamber Mix-Combustion Chamber Smoke Filter Chamber Incinerator Control Case Chimney:10.0Meters *(upgrade to […]
Automatic PLC controller incinerator plant with Dual heat burners and dual chamber HICLOVER YD-30C with Wet Scrubber
Item Specification Model YD-30C Main Product List Primary Combustion Chamber(Main body stainless steel) Secondary Combustion Chamber(Main body stainless steel) Mix-Combustion Chamber Wet Scrubber( Washing Tower)(Main body stainless steel) Incinerator Control Case Chimney:5.0Meters *(upgrade to Stainless Steel, free cost) Italy gas burner: 02 sets Oil Tank (if oil fuel): 100Liters Automatic PLC controller incinerator plant with […]
Medical Waste Incinerator HICLOVER TS10 PLC 10kgs per hour
medical waste incinerator iraq price HICLOVER TS10 PLC 10kgs per hour Items/Model TS10(PLC) Picture Burn Rate Average 10 kg/hour Feed Capacity Average 20kg/feeding Control Mode Programmable Logic Controller(PLC) Panel Combustion Chamber 100L Internal Dimensions 50x50x40cm Secondary Chamber 50L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 0.5Kw Oil Consumption (kg/hour) average 8.4kg/hour Gas […]
cheap incinerators
RECYCLABLE WASTE PLASTIC (NON-PVC) 218,693 CARDBOARD 85,046 PAPER 4,956 PVC 15,115 HAZARDOUS WASTE MEDICAL WASTE 1,084 SOLID WASTE CONTAMINATED WITH HYDROCARBONS 300,680 USED ENGINE OIL FILTERS 85,423 HYDROCARBON-CONTAMINATED SOILS 88,680 ORDINARY WASTE FIBERS 14,078 USED AIR FILTERS (AUTOMOTIVE AND SIMILAR) 23,149 PERSONAL PROTECTIVE EQUIPMENT (PPE), […]
china medical incinerator
the following containerized incinerators. (Kitchen and accommodation and grey water and black water plant removing waste) we need incinerator is each function separate are all in one incinerator we need informed. Plant we installing for our accommodation barge used in an offshore marine construction project. 200 People would be accommodated onboard. WASTE INCINERATORS RECOMMENDATIONS china […]
medical incinerator primary combustion price
Our normal activities generates 2-5 tons of assorted waste materials per day which range from condemned carcasses, and medical incinerator primary combustion price other wastes all which need to be incinerated at above 800Centigrade measured flue exhaust gas.To be used by small hospitals and clinics to safely dispose of infectious and pathological wastes. Load Capacity […]
medical incinerators
* medical incinerators, The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks in order to assure a minimum temperature on the outside sheet metal. * Composition of the refractory; ? Refractory concrete : ? . Thickness : ≥100 mm ? . Nature: 42% […]
Wastes That Can be Burned or Incinerated
Complete combustion converts waste into inert bottom ash with minimal creation of smoke, fly ash and hazardous gases. Several factors influence this process including the heating value, wetness and chemical composition of the waste itself, operating conditions in the burn chamber (i.e. temperature, holding time and turbulence) and operator skill. The method used is important […]