Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope.Ash Removal It should be auto ash removal system.Fuel It should be dual system, such as diesel and natural gas.Feeding System Should be auto feeding system into primary chamber.Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc.Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C.Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C.Flue treatment and cleaning To consist a combined system (wet/dry), using water, lime, active carbon and ceramic filters.Quenching system/Heat exchanger Should be made and manufactured from anti corrosion and acid attack materials such as stainless steel 316 or equivalent.Noise Level Not more than 85 dBA during normal operation.Inaddition The desigh should insure that responsive fail-safe control systems are used. The incinerator should be installed inside closed suitable building with good aeration and ventilation system. The building has facilities for off-loading of wastes from transport vehicles. Auto cleaning  ;system for trucks and waste containers, and cool storage area…etc. The quotation should included list of original spare parts for 7 years. The quotation should include supervising, starting up and training of the operators and ministry of health engineers inside/outside Kuwait. Detailed drawings, catalogs should be included.
Tag: waste
Six Sets Medical Waste Incinerator with 30kgs per hour capacity for Pakistan this week.
Six Sets Medical Waste Incinerator with 30kgs per hour capacity for Pakistan this week.
DIESEL FIRED INCINERATOR, WITH 1000 LTR FUEL TANK AND 6M CHIMNEY
Items/Model TS250(PLC) Picture Principle Waste Incineration Treatment Burn Rate Average 250 kg/hour Feed Capacity Average 400kg/feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 2000L Internal Dimensions 210x88x110cm Secondary Chamber 1000L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 2.0Kw Oil Consumption (kg/hour) Average 24.2(DO) Gas Consumption (m3/hour) *** Temperature Monitor Digital Display […]
waste incinerator manufacturers from china
Incinerate: medical waste and general waste Capacity to burn waste: 400-500kg/hr Fuel: Diesel Fuel Consumption: 10 liters/hr maximum Incineration temperature: 950-1300 degrees centigrade Casing: thick (min 5mm) stainless steel casing and fully insulated to withstand sea humidity Voltage 220/240v or 380/415V Frequency 50Hz high-capacity, powerful, European Standard incinerator,ideal for high volume incineration,with integral after-burner for […]
Incinerator with 1 or 3 section type wet scrubber
Medical waste is currently managed via an old medical waste incinerator; which also manages the associated medical waste delivery and ash removal arrangements.Pathological waste: organs, tissues, surgical specimens, bodily fluids removed during surgery or autopsy. Mix and moisture content not known.Allow for weekly deliveries @ 8 hour per day operation = 11 kg per hour […]
medical waste diesel incinerator
medical waste diesel incinerator Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max […]
Mobile Containerized Waste Incinerators HICLOVER CA-200
Mobile Containerized Waste Incinerators pets or human cremation emergency use Model CA-200 Picture Burning Rate Average 100 kgs/hour Primary Combustion Chamber 2000 Liters Secondary Combustion Chimney Yes Feed Mode Manual Voltage 220V Power 3.0 Kw Fuel Type Diesel Oil Burner Italy Original Oil Consumption (Diesel Oil) Average 53 kg/hour Internal Dimensions 200 x 100 x […]
medical waste incinerator
medical waste incinerator: medical waste and general waste Capacity to burn waste: 400 — 500 kg/hr Fuel: Diesel Fuel Consumption: 10 litres/hr maximum Incineration temperature: 950 – 1300 °c Casing: thick (min 5 mm) Stainless steel casing and fully insulated to withstand sea humidity Voltage: 220/240 V or 380/415V Frequency: 50 Hz Feeding: automatic Ash […]
Pet Crematory HICLOVER A600
Model A600, crematorium manufacturers Internal Dimensions 130 x 70 x 65cm Suit for Animal Cat – yes Dog – yes Pig – no Cow – no Main Product List Primary Combustion Chamber Secondary Combustion Chamber Mix-Combustion Chamber Smoke Filter Chamber Incinerator Control Case Chimney:5.0Meters *(upgrade to Stainless Steel, free cost) Italy oil/gas burner: 02 units […]
Waste Incineration Treatment BURNING RATE : 100-150kgs per hour HICLOVER TS150
BURNING RATE : -100-150kgs per hour MINIMUM OPERATING TEMPERATURE : 800-1000 oC ( PRIMARY COMBUSTION ) MAX OPERATING TEMPERATURE : 1000-1200 oC ( AFTER BURNER COMBUSTION ) SECONDARY BURNING CAPACITY : COMPULSORY DENSITY INSULATION : 50 mm high Refractory capacity : min 114mm HEAVY DUTY REFRACTING LINING TO WITHSATND 17500C AVEARGE BURN OUT TIME : […]