WASTE INCINERATOR

INCINERATOR (WASTE INCINERATOR)
Designed to burn disposables that can and should be destroyed on-site. Theses wastes include infectious and contaminated “red bag.” Surgical dressings, plastic test devices and other wastes
Fast, complete, efficient waste disposal
Dual chamber combustion, Chambers insulated and lined with high temperature refractory. Programmable digital temperature controls, temperature indicators and charge recorder. Modulating control for fuel and air lowers fuel consumption.
Minimum installation and start up time
Aluminized steel jacket lined with refractory and firebrick. Monitors recorders and other accessory equipment should be available.
Charging system:

  • Vertical charge door on primary chamber.
  • Pneumatic or hydraulic ram charging system.
  • Auto shut down of the door after charging.
  • Primary and secondary chamber temperature displayed and recorded (optional)

Charging rate:

  • Up to 100kgs per hour of waste or red bag waste rated at 2200 BTU’s per kg.

Fuel:-         Natural Gas
Capacity (Cubic Mtr):   1.65M3 or more
Ave Capacity:      100kg per hour
Secondary Chamber Capacity (CubicMtr) :3.88 or more
Length (mm):      1880 or better
Width (mm):       1280 or better
Height Incl. Flue (mm):         7700 or better
Ash Door Opening (mm):   475×900 or better
Min. Operating temperature:         90 degree centigrade
Max, Operating Temperature:       1350 degree centigrade
Residency time in Second Chamber:       2 sec
Temperature Monitoring: Both for primary and secondary chambers.
Loading SystemManual/semi-automatic
Waste destruction efficiency:> 90% by weight
Filter: Ceramic or other equivalent filters in order to reduce the induction of hazardous air pollutants, particulates, co,dioxin/furane into the atmosphere.
De ashing system: Manual/semi-automatic.
The System must be quoted complete with:-

  • Plumbing
  • Electrical panels
  • Civil works
  • Waste collection Trolleys

 
Finish/ Paint:-
High Quality heat resistant, two layers high-grade epoxy Paint coating.
Installed Power (Electric Voltage): 440V/ 50 Hz
Waste Management Equipment must have ;
Mobile loading trolley: 06 No’s – For transportation of hospital waste from wards to incinerator site/ room, Opening from the top.
WASTE BINS MOBILE: 06 No’s-Made of Plastic, in blue color with a cover flap.
Plastic Bags:       2000 no’s each in Red and Yellow color.
Heavy Duty Gloves Pairs: For Waste handling staff-06 Pairs
Long Shoes Pairs:         For waste handling – 06 Pairs.
Make: UK, Europe, USA, Japan

Newsletter – incinerator

Google
incinerator

Medical Waste Incinerators ⋅ 2019年7月6日
www.imcha.net

Error loading: “https://www.rfa.org/cantonese/news/incinerator-07052019093230.html/china-incinerator.mp3″. 收听节目 · 声音下载. 湖北武汉市政府拟 …
Facebook Twitter 标记为不相关
查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
Newsletter。

|
RSS 以RSS Feed的形式接收此快讯

发送反馈

Animal waste incinerator

Incinerator type: Animal waste incinerator
Load Capacity minimum:  1500 kg
Burner fuel type:  Diesel
Burner fuel rate max.:   20-25 Liter diesel/ per hour
Burners minimum: 3
Burning rate minimum: 200-300kg/per hour
Furnace bar area minimum: 2 м3
Fuel tank capacity minimum: 300L
Main chamber burning temperature min. 1100 0C
Afterburner chamber burning temperature min.  1300 0C
Power supply 220V
Incinerator items and electrical appliances should be weather proof and humidity resistant within the range of 30-90 %
Incinerator should be compliant to the environmental protection rules in accordance to national legislation
Maximum dimensions – Length – 5m, width – 3.5m, height – 5m

Chamber Double Incinerator

Chamber Double Incinerator:
Burning Rate      10 kg per hour (for two incinerators)
Burning Rate     20 kg per hour (for three incinerators)
Loading   Method   Manual
No of Burners   Single for 10 kg/hour and Double for 20 kg per hour
Fuel                    Diesel and Natural Gas
Warm Up Time    Not more than 20 minutes
Temperature controller   Digital
Power Supply      Single Phase 220V
Chimney Height    20 feet from ground level
Wet and Dry Scrubbers   Optional
 

Gasified incineration for burning medical wastes

Gasified incineration for burning medical
wastes.
 
Fuel type: Natural Gas
Burning Capability:
–   30-50 kg/time
–   Daily 3-6 times
 
Incinerator size: max 2000x1200x3200 mm
Burning room volume:
–   Gasification room max 0.7 m3,
–   Secondary burning room max 0.5 m3,
 
Size of the filling entrance: max 650×850 mm
Air blower: max 0,5 kW
Combustion-support combustion machines:
–   Power max 0,2 kW
 
Re-burning machine: Power max 0,2 kW Voltage: 220V / 380V
Weight: max 5000 kg
User Manual Language: English

Newsletter – incinerator

Google
incinerator

Medical Waste Incinerators ⋅ 2019年7月6日
网页
CFR-2006-title40-vol6-sec60-3062

Subpart Ffff – Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced Construction On or Before …
Facebook Twitter 标记为不相关
查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
Newsletter。

|
RSS 以RSS Feed的形式接收此快讯

发送反馈

Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.

 
Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.
Requirements:

  1. Incinerator system complete with scrubber, pollution control system, water system, loading system, ash removing system and if anything more option is available. we have to burn 10000kgs/day, We work 8 hours a day, so your incinerator should have capacity to burn atleast 1400 or 1500kg/hr of waste.

 
supply 02 primary combustion chamber, and continuation feeding or alternately. each primary combustion volume is 4.0 M3, total 8 m3.

  1. With complete system specification, power, water fuel requirements.

 

  1. Space requirements & floor plan

 

  1. Pre-installation requirements. Space, power, water, drainage system etc

 

  1. Fuel type” diesel or gas?

 

  1. All options available.

 

  1. You have to send your technical team for installation, user training, maintenance training for end user technicians.

 

  1. Maintenance schedule—what has to be done, daily, weekly, quarterly, half yearly, annually.

 

  1. What are the replacement items during one year.

 

  1. Your system should meet all local & international standards with respect to handle of tobacco dust before feeding to incinerator, gas emission, waste water discharge to public drain system, ass disposal etc.

 

  1. End used will send this dust to incinerator plant in bags of 300kg each, so we are expecting 35 bags of 300kg each per day, 7 days a week.

 
 

  1. How many engineers or technicians you will send for installation, how many people, what machines & tools you want us to mobilize to facilitate your people to do the installation. how many days installation & training will take.

 
 

  1. What will be your charges for installation visit.

 
 

  1. If you have some picture of such big installations, references(within this region is helpful if you have), you can provide us.

 
 
 
 
 

Newsletter – waste incinerator

Google
waste incinerator

每天更新 ⋅ 2019年7月4日
www.imcha.net

The immense incineration plant, a waste-to-energy plant that burns trash to generate electricity, is located just 10 kilometers (6.21 miles) from …
Facebook Twitter 标记为不相关

Remains believed to be those of a missing 2-year-old Virginia boy were found Wednesday morning in a steam plant that converts trash to energy, …
Facebook Twitter 标记为不相关

New trash sorting rules took effect in the Chinese metropolis of Shanghai this week — and the second phase of the world’s largest incinerator started …
Facebook Twitter 标记为不相关

The Beirut Municipal Council will discuss the book of terms for a waste incinerator Thursday, as Beirut MP Paula Yacoubian called on those who …
Facebook Twitter 标记为不相关

Environmental groups launch campaign for zero waste …. Pecci also mentioned Wheelabrator trash incineration and the company’s plans to expand …
Facebook Twitter 标记为不相关

The tender for the waste incinerator is not the only one connected to Klodian Zoto in Albania. Journalist Artan Rama discovered that a complex of …
Facebook Twitter 标记为不相关

… at The Jackson Laboratory’s vivarium here would normally go to a trash incinerator, as would the clam and lobster shells from Maine Shellfish Co.
Facebook Twitter 标记为不相关

You’re working on plastics issues now, but one of the things you’re most recognized for is an anti-incineration campaign you organized in the mid-’90s …
Facebook Twitter 标记为不相关

… waste along the banks of Hessian Run, unauthorized use of an incinerator, ash from lead smelting operations dumped in an onsite landfill, two fires …
Facebook Twitter 标记为不相关

According to the source, the Ministry of Health has already contracted with the Al-Jahra Cleaning Equipment Company for the disposal of waste for a …
Facebook Twitter 标记为不相关
查看更多结果 | Auto. Control Waste Incinerator & Auto. Roll Air Filter(Air Purification)
Newsletter。

|
RSS 以RSS Feed的形式接收此快讯

发送反馈

CLOVER Containerized Incinerator

Technical Specifications

  1. Pre-assembled, containerized type

—yes, do not included chimney installation.
 

  1. Burning rate: 100 – 120kg / hour

—yes
 

  1. Minimum operating temperature: 8500c (Primary combustion)

—800-1000 degree
 

  1. Maximum operating temperature: 14500c (afterburner chamber)

—1000-1200 degree
 

  1. Secondary Burning capacity: Compulsory.

—yes
 

  1. Density insulation: 20 mm high

—50mm
 

  1. Refractory casting: minimum 65mm

—110mm
 

  1. Heavy duty refracting lining to withstand 15000c

—1450 degree
 

  1. Average burn out time: maximum 3.0 hrs

—yes
 

  1. Fuel type: fuel oil (diesel)

—yes
 

  1. Fuel consumption in L/hr: 7.5 to 9

—average 16.6liter/Hr.
 

  1. Residency time in secondary chamber: 2 secs.

—yes
 

  1. Residue ash post 100kg Max 3.8 kg

—yes
 

  1. Installation period Maximum 7days.

—yes