Chamber Double Incinerator

Chamber Double Incinerator:
Burning Rate      10 kg per hour (for two incinerators)
Burning Rate     20 kg per hour (for three incinerators)
Loading   Method   Manual
No of Burners   Single for 10 kg/hour and Double for 20 kg per hour
Fuel                    Diesel and Natural Gas
Warm Up Time    Not more than 20 minutes
Temperature controller   Digital
Power Supply      Single Phase 220V
Chimney Height    20 feet from ground level
Wet and Dry Scrubbers   Optional