In the process of developing a project, we came across an issue, which is the estimate cost of incinerators plants (capable to destroy chlorinated in an environmental friendly way – please provide cost estimate/price range of incinerator plant). What kind of waste is to be burned? In which country the incinerators have to be installed? […]
Category: blog
SHARP MEDICAL WASTES
A SET OF INCINERATOR FOR DISPOSAL OF SUCH HOSPITAL SHARP WASTES LIKE THE NEEDLES,SYRINGES,CUTTERS, BLADES, ETC. WASTE BUCKET/TANK – ABOUT 2000KG CAPACITY OF FEEDING: ABOUT 600-800Kg AT A TIME. BURNING AT ABOUT 150/165-200 IN 60MINS THE BURNER SHALL USE DIESEL/OIL WITH CHIMNEY, ELECTRIC PANNELS,ELECTRIC MOTORS,ETC. MATERIALS FOR DISPOSAL: SHARP MEDICAL WASTES.
Mixed Biomedical waste Incinerator
Product :Mixed Biomedical waste Incinerator Quantity :60 units Contract period:To be decided by the supplier Please confirm your willingness to execute this contract project by sending brochure and your price quotation for the below specification to enable us submit it to the firm incharge […]
WASTE INCINERATOR
INCINERATOR (WASTE INCINERATOR) Designed to burn disposables that can and should be destroyed on-site. Theses wastes include infectious and contaminated “red bag.” Surgical dressings, plastic test devices and other wastes Fast, complete, efficient waste disposal Dual chamber combustion, Chambers insulated and lined with high temperature refractory. Programmable digital temperature controls, temperature indicators and charge recorder. […]
Animal waste incinerator
Incinerator type: Animal waste incinerator Load Capacity minimum: 1500 kg Burner fuel type: Diesel Burner fuel rate max.: 20-25 Liter diesel/ per hour Burners minimum: 3 Burning rate minimum: 200-300kg/per hour Furnace bar area minimum: 2 м3 Fuel tank capacity minimum: 300L Main chamber burning temperature min. 1100 0C Afterburner chamber burning temperature min. 1300 […]
Chamber Double Incinerator
Chamber Double Incinerator: Burning Rate 10 kg per hour (for two incinerators) Burning Rate 20 kg per hour (for three incinerators) Loading Method Manual No of Burners Single for 10 kg/hour and Double for 20 kg per hour Fuel Diesel and Natural Gas Warm Up Time Not more than 20 minutes Temperature controller Digital Power […]
Gasified incineration for burning medical wastes
Gasified incineration for burning medical wastes. Fuel type: Natural Gas Burning Capability: – 30-50 kg/time – Daily 3-6 times Incinerator size: max 2000x1200x3200 mm Burning room volume: – Gasification room max 0.7 m3, – Secondary burning room max 0.5 m3, Size of the filling entrance: max 650×850 mm Air blower: max 0,5 […]
Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.
Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant. Requirements: Incinerator system complete with scrubber, pollution control system, water system, loading system, ash removing system and if anything more option is available. we have to burn 10000kgs/day, We work 8 hours a day, so your incinerator should have capacity […]
CLOVER Containerized Incinerator
Technical Specifications Pre-assembled, containerized type —yes, do not included chimney installation. Burning rate: 100 – 120kg / hour —yes Minimum operating temperature: 8500c (Primary combustion) —800-1000 degree Maximum operating temperature: 14500c (afterburner chamber) —1000-1200 degree Secondary Burning capacity: Compulsory. —yes Density insulation: 20 mm high —50mm Refractory casting: minimum […]
Double Combustion Chamber Incinerator
All waste incinerator design with double combustion chamber. High Temperature, Smoke Treatment,No black smoke, Environmentally friendly.