Incinerator shall be used to burn all non biodegradable wastes generated personnel in the mission area and convert into ash so that waste
can be managed in an environmentally safe manner.
Using the General Requirements and specific requirements on this section, the contractor shall supply, install, commission, and
provide training and spare parts (for scheduled one year) of an Incinerator.
The contractor shall supply, install, commission, and provide training and spare parts (for scheduled one year) an incinerator camps. The
proposed Incinerator should have the following specification parameters or approve equal. Bidder should elaborate the proposed variance of
any portion of this specifications and the impact it might have on the desired general propose of the incinerators.
WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters
Nanjing Clover Medical Technology Co.,Ltd.
Tel: +86-25-8461 0201
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com
Email: sales@hiclover.com
Email: hicloversales@gmail.com