steps of waste management

Item Specification
Model A1500
Internal Dimensions 150 x 100 x 96cm
Suit for Animal Cat – yes Dog – yes Pig – yes Cow – small
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix-Combustion Chamber
Wet Scrubber( Washing Tower)
Incinerator Control Case
Chimney:10.0Meters *(upgrade to Stainless Steel, free cost)
Italy oil burner: 03 sets
Oil Tank : 500Liters

Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/
Email: sales@hiclover.com
Email: hicloversales@gmail.com

Nanjing Clover Medical Technology Co.,Ltd.

HICLOVER Incinerator/Parts Range Main Feature
Medical Waste Incinerators HICLOVER 10-500kgs/Hr.Double Combustion Chambers
Single Combustion Chamber Small, Cheap,10-20kgs/Hr.
Three Combustion Chambers(Optional) 3 Chambers for high risk waste
Pet Cremation Equipment For Pet(small/big) Cremation Business
Animal Incineration Equipment For other animal incineration

hospital waste management ppt 2018

Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100 kg/hour 150 kg/hour 300 kg/hour 500 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Oil Tank 200L 300L 500L 500L
Chimney 10Meter 10Meter 14Meter 14Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 6000kg 8500kg 11000kg 16000kg
External Dimensions 260x150x180cm 300x160x190cm 400x210x300cm 450x210x300cm

brick incinerator design,The control system shall include an electronic performance monitoring and logging system. The system shall be capable of monitoring and logging chamber temperatures at regular intervals (not less than once per minute, with the capacity to vary the logging frequency). The system shall include the capacity to download the performance data by USB connection.
All the measuring devices attached with the incinerator should have digital display and should have provision of connecting to the recording system, which should include fuel meter and separate energy meter.
The temperature shall be determined against the inside wall of the combustion chambers. An audible and visible alarm shall be installed to warn the operator when the secondary temperature drops to below the required temperature.
The primary chamber must meet or exceed the following criteria:
“• Heavy steel construction.
• Fixed hearth geometry and starved air gasification operational mode.
• Hot face refractory concrete-ceramic suitable for thermal shock up to 1400 Celsius and abrasion. Minimum thickness 150mm.
• Cold face refractory lining of calcium silicate or superior material, minimum thickness 100mm.
• Refractory lining of all the ducts shall be done with refractory castings. Superior quality ceramic wool shall be used at all hot duct flanges and expansion joints.
• Multiple electric ignition fuel burners designed to use automotive diesel fuel.
• Flame of the primary burner shall be oriented towards the center of the unit which does not impinge directly on the refractory floor or wall. The secondary burner shall be positioned in such a way that the flue gas passes through the flame.
• The unit shall prevent leakage of the hot flue gas and any backfire.
• An electrically powered fan forced air supply, with the capacity for variation by the operator.
• Digital thermometers connected to electronic dataloggers. The thermometers shall be located on the chamber walls away from the fuel burner.
• A differential air pressure gauge connected to an electronic datalogger

CE Certification Pass

HICLOVER Solution for Fighting COVID-19 with CE Certification.

1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)

2. Auto Roll Air Filter for Clean Room

2021-02-22