Blog

Incinerator 300 Kgs

Product Description

Nanjing Clover Medical Technology Co., Ltd., local in Nanjing city, China.

Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

UN BRÛLEUR DE DÉCHETS MÉDICAUX PYROLYTIQUE POUR UNE GRANDE VARIÉTÉ

BESOINS D’UN CHAUFFE-EAU PYROLYTIQUE POUR UNE GRANDE VARIÉTÉ
1. Capacité de dommages en poids: 500 kg / h.
2. Il doit avoir la capacité de fonctionner très peu moins de 8 heures / jour
3. Ce brûleur doit être capable de détruire tous les déchets combustibles produits par les installations médicales, les installations personnelles, les laboratoires, les instituts, etc.
4. Spécifications de conception: types A, B, C, D, ainsi que E de déchets cliniques.
5. Combustion PYROLYTIQUE, en régulant la gazéification des déchets.
6. L’incinérateur doit empêcher le lancement de fumée noire et en plus de grandes poussières (sans fumée) pendant les chargements.
7. Il devrait avoir la capacité de réduire le volume de déchets de 98%.
8. Il doit avoir la capacité de retenir la décharge dans la deuxième fusion avec une maison à gaz de très peu moins de 2.
secondes.
9. L’incinération doit être totalement dépourvue de fumée évidente en plus des odeurs offensantes.
10. Le pouvoir calorifique inférieur (LCP) de ces déchets sera certainement de 3 500 kcal / kg.
Les degrés de température de combustion: Le minimum sera certainement de 850 ° C ainsi que le maximum de 1400 ° C.
Postcombustion: >> 1100oC.
11. La taille intérieure de l’arbre à fumée: Ø 400 et aussi son élévation: 8 m.
12. La quantité de la chambre de combustion: 1.200 L.
13. La mesure de la porte pour le chargement en centimètres: 120 × × × × 120.
14. La procédure du brûleur doit être Marche / Arrêt automatique.
15. Gaz: diesel / gaz.
16. Le fournisseur doit fournir les détails requis pour le meilleur de la tranche. Ce brûleur à combustion PYROLYTIQUE nécessite d’avoir:
17. Une chambre de combustion des déchets :.
* Porte totalement limitée pour le chargement pratique des déchets. Le chargement doit être manuel, établi.
Charge.
* Une unité de chauffage d’éclairage dont l’utilisation est limitée à l’inflammation des déchets.
* Façade de garniture avec joints de porte augmentée sur charnières, roue de bouchon à vis, joint polyvalent, en plus de garniture blindage en réfractaire.
* L’isolation de la chambre de combustion doit être composée de blocs réfractaires, ayant un produit élevé en aluminium en plus de sécuriser les briques afin de garantir un niveau de température minimum dessus.
la tôle d’acier à l’extérieur.
* Composition du réfractaire;.
Béton réfractaire:
. Epaisseur: 100 mm
. Nature: 42% d’Al203.
Bouclier dans les panneaux bruts:

. Epaisseur: 75 mm.
Nature: silicate de calcium.
* Brûleur d’éclairage des déchets, avec gaz, flamme de plongée principale coulée mono-bloc traditionnelle, éclairage ainsi que sûreté et sécurité ainsi que sûreté et sécurité de l’allumage numérique, flux d’air durable, entrée électromagnétique de la ligne de guidage et vanne d’isolement également.
* Plaque de brûlage en Carborundum, en évitant la fixation du verre ainsi que des scories.

18. Une chambre de combustion des gaz.
* Un système de chauffage de combustion de gaz ,.
* Un outil d’injection d’air permettant une recombustion totale des gaz ,.
* Un dispositif d’entrée d’air de climatisation des gaz résiduaires ,.
* Une gaine de vidange du hangar à gaz.
* Carcasse en tôle d’acier massif avec assistance de maillon.
* Cosmétiques du réfractaire;.
Béton réfractaire:.
Epaisseur: 150 mm.
Nature: 65% d’Al203.
Protéger dans le panneau grossier:.
Densité: 85 mm.
Nature: Calcium.
* Système de chauffage au gaz, type d’assistance à l’épandage mono-bloc avec feu droit, lumières ainsi que sécurité et sécurité de l’allumage électronique, débit d’air durable, entrée de vanne électromagnétique et arrêt d’isolement.
* Une deuxième injection d’air pour assurer le meilleur produit d’oxygène.
19. Un boîtier de commande assurant le cycle total de combustion.
20. Un dispositif de contrôle de la contamination de l’air connecté à la cheminée du conduit de fumée doit être connecté pour quitter.
retrait inutile des impuretés

21. Ventilateur :.
* Electro-ventilateur dispersant le second air, la politique du débit d’air étant mise en œuvre par des vannes en même temps que le suivi du contrôle du cycle automatique.
22. Contrôles et réglementations complémentaires :.
Boîtier de commande étanche à la poussière, composé de:

* Un disjoncteur à bouton pour chaque moteur (ventilateurs et radiateurs).
* Une minuterie avec temporisation adaptable au standard de chaque brûleur.
* Une autorité de régulation à la recherche du niveau de température de combustion.
* Une autorité dirigeante avec surveillance de la température de post-combustion du blog.
* Boîte électrique.

21. Le décendrage doit être effectué dans le bas absolu de la chambre de combustion ou le décendrage doit être un décendrage automatique ou manuel.
22. Système de filtrage de précision: Scruber à mentionner comme optionnel.
23. Conformité aux exigences de la version: BS 3316 ou norme équivalente.
23. Capacité à traiter le plastique: très peu moins de 40% en poids.
24. Conformité de fabrication CE: BS EN 746-2-1997

23. L’entreprise doit fournir des lots de composants ajoutés d’une gravité très initiale en plus des consommables du brûleur.
24. L’incinérateur monté doit porter une garantie d’un an.
25. Le fournisseur exécutera certainement une installation sur place du brûleur.
25. La formation technique des chauffeurs devra certainement être assurée ainsi que par un technicien de service de l’usine de production; il comprendra absolument un entretien médical et préventif supplémentaire, ainsi que l’utilisation du fabricant, etc.

NB: Les travaux de génie civil ainsi que tout type de diverses autres solutions connectées pour la configuration et la formation des opérateurs doivent être inclus dans les frais de chauffage.

biomedical waste management

HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, supply system solutions for medical environmental protection, animal and pet cremation engineering, other municipal solid waste incineration project.

We supply single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators for laboratory, clinic, hospital, medical center, hygiene clinical waste destruction with medical disposable, biological waste, medical plastic waste, hazardous waste, red bag waste, needle disposal, gauze and bandages, sealed sharp containers, pathological waste, trace-chemotherapeutic wastes, etc. pet cremations,trash incinerator,incinerator for sale,cremation oven

حرق`

معلومات أساسية.

مصادر السحب: معالجة النفايات الصلبة
طرق المعالجة: الاحتراق
أسواق التصدير: عالمية

معلومات إضافية.

العلامة التجارية: البرسيم

وصف المنتج

دلائل الميزات:
* جميع الموديلات بغرفة احتراق مزدوجة.
* مدخنة / كومة من الفولاذ المقاوم للصدأ ، عمر طويل. * حسب الطلب
* ارتفاع درجة الحرارة ، وعمر طويل من المحرقة.
* تثبيت مجاني أو بحد أدنى في الموقع.
* معدل حرق مرتفع ، من 10 كجم إلى 500 كجم في الساعة ، حتى 6 طن في اليوم.
* طائرة التحكم PLC. * حسب الطلب
* تصميم جديد لأعمال حرق جثث الحيوانات الأليفة.
* ضمان لمدة سنة على المحرقة والأجزاء الموجودة في المخازن.

المحرقة عبارة عن معدات حرق ، نفايات حريق مباشر بواسطة وقود الغاز أو وقود عالي الجودة. كطوق مختلف ، يمكن تسمية المحرقة بالعديد من الكلمات على النحو التالي:

قدرة المعالجة: محرقة صغيرة الحجم ، محرقة واسعة النطاق وبانت حرق.

مواد النفايات: محرقة النفايات البلدية ، محرقة النفايات الطبية ، محرقة جثث الحيوانات ، محارق الجثث البشرية

وقود المحرقة: محرقة الغاز ، محرقة الزيت

تحويل النفايات إلى طاقة (WTE): محرقة WTE ، محرقة لا تستخدم WTE

الشركة المصنعة للمحرقة: الشركة المصنعة للمحرقة في الصين ، الشركة المصنعة للمحرقة في المملكة المتحدة ، الشركة المصنعة للمحرقة بالولايات المتحدة الأمريكية ، الشركة المصنعة للمحرقة في الهند.

الشركة المصنعة للمحرقة الشهيرة: Inciner8 (UK) ، Clover Incinerator (الصين) ، Pennram (الولايات المتحدة الأمريكية) ، Haat (الهند)

معدل الحرق: 5 كجم / ساعة ، 10 كجم / ساعة ، 15 كجم / ساعة ، 20 كجم / ساعة ، 30 كجم / ساعة ، 50 كجم / ساعة ، 100 كجم / ساعة ، 150 كجم / ساعة ، 300 كجم / ساعة ، 500 كجم / ساعة ساعة

العناصر / النموذج TS10 (PLC) TS20 (PLC) TS30 (PLC) TS50 (PLC) TS100 (PLC)
معدل الاحتراق 10 كجم / ساعة 20 كجم / ساعة 30 كجم / ساعة 50 كجم / ساعة 100 كجم / ساعة
سعة الأعلاف 20 كجم 40 كجم 60 كجم 100 كجم 200 كجم
وضع التحكم PLC PLC PLC PLC PLC
غرفة الاحتراق 100 لتر 210 لتر 330 لتر 560 لتر 1200 لتر
خفض الماوس لعرض الإجابة 50x50x40 سم 65x65x50 سم 75x75x60 سم 100x80x70 سم 120x100x100 سم
الغرفة الثانوية 50 لتر 110 لتر 180 لتر 280 لتر 600 لتر
غرفة مرشح الدخان نعم نعم نعم نعم نعم
وضع التغذية يدوي يدوي يدوي يدوي يدوي
الجهد االكهربى 220 فولت 220 فولت 220 فولت 220 فولت 220 فولت
قوة 0.5 كيلو واط 0.5 كيلو واط 0.5 كيلو واط 0.7 كيلو واط 0.7 كيلو واط
استهلاك الزيت (كجم / ساعة) 5.4 – 12.6 7.8 – 16.3 10.2 – 20 12.1 – 24 14 – 28
استهلاك الغاز (م 3 / ساعة) 6.2-11.4 8-15.7 9.8 – 20 9.9 – 26.1 10 – 32.2
مراقب درجة الحرارة نعم نعم نعم نعم نعم
حماية درجة الحرارة نعم نعم نعم نعم نعم
خزان النفط 100 لتر 100 لتر 100 لتر 100 لتر 200 لتر
باب التغذية 30×30 سم 45×40 سم 55×50 سم 70×55 سم 80×60 سم
مدخنة 3 متر 3 متر 5 متر 5 متر 10 أمتار
نوع المدخنة ستانلس ستيل ستانلس ستيل ستانلس ستيل ستانلس ستيل ستانلس ستيل
الأول. درجة حرارة الغرفة 800-1000 درجة 800-1000 درجة 800-1000 درجة 800-1000 درجة 800-1000 درجة
الثاني. درجة حرارة الغرفة 1000-1200 درجة 1000-1200 درجة 1000-1200 درجة 1000-1200 درجة 1000-1200 درجة
وقت الإقامة 2.0 ثانية. 2.0 ثانية. 2.0 ثانية. 2.0 ثانية. 2.0 ثانية.
الوزن الإجمالي 1500 كجم 2200 كجم 3000 كجم 4500 كجم 6000 كجم
الابعاد الخارجية 140x90x120 سم 160x110x130 سم 175x120x140 سم 230x130x155 سم 260x150x180 سم

اتصل الآن هاتف: + 86-25-8461 0201

INCINÉRATEUR À ÉLIMINATION DES DANGERS BIOLOGIQUES CONTENUS DANS UN RÉCIPIENT DE 20 PIEDS

ÉLIMINATION DES RISQUES BIOLOGIQUES: CONTENEUR

INCINÉRATEUR GÉNÉRAL, ADAPTÉ À L’INCINÉRATION DE DIFFÉRENTS TYPES DE DÉCHETS, ABSOLUMENT CONTENU DANS UN CONTENEUR DE 20 PI, COMPRENANT UN RÉCIPIENT À CARBURANT INTÉGRÉ ainsi qu’un GÉNÉRATEUR.

SPÉCIFICATIONS TECHNIQUES: MONTANT DE LA CHAMBRE DE REMBOURRAGE (M3); 0,54 m3. DIMENSIONS SUGGÉRÉES DE L’ENSEMBLE: 60 KG, COÛT DE BRÛLURE: 69 KG PAR HEURE, UTILISATION STANDARD DU GAZ 13 KG PAR HEURE, TEMPÉRATURE DE FONCTIONNEMENT: 950-1320 CELSIUS, RÉTENTION DE GAZ DANS LA CHAMBRE SECONDAIRE 0,5 SEC, AVEC NIVEAU DE TEMPÉRATURE SURVEILLANCE, DÉPÔT DE CENDRES STANDARD: 3%, OUTIL THERMOSTATIQUE: OUI,
DIMENSIONS: LONGUEUR EXTÉRIEURE (mm): 1520 MM, TAILLE EXTERNE (mm): 920 MM, HAUTEUR EXTÉRIEURE (mm): 4020 MM
1. Brûleur nécessaire pour l’incinération des déchets bio-médicaux
2. 50 kg / heure
3. 2 chambres doivent exister
4. le degré de température de la chambre principale doit être de 850 degrés Celsius
le niveau de température de la chambre ajoutée doit être de 1200 niveaux Celsius

Medium sized incinerator

Medical Waste Incinerator for Coronavirus Disease( COVID-19). 
 
* Full variety incinerator with Standard Small-Large Scale incinerator, General Municipal Solid Waste Incinerator, Containerized Mobile Incinerator, High Efficient Environmental Waste Incinerator. 
* Single burning chamber, double combustion chambers, three combustion chambers and also multi-combustion chambers waste incinerators. 
* System solutions for clinical waste environmental. 
* High burnning price, from 5kgs to 1000kgs per hour. 
* HICLOVER, relied on partner with years of experience. incineration of medical waste,incinerators municipal waste

Items/Model

TS30(PLC)

Picture

Brand/Code

HICLOVER/N994

Burn Rate

Average 30 kg/hour

Feed Capacity

Average 60kg per feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

330L

Internal Dimensions

75x75x60cm

Secondary Chamber

180L

Smoke Filter Chamber

Yes

Feed Mode

Manual Feeding

Voltage

220V

Power

0.5Kw

Oil Consumption (kg/hour)

Average 13.3

Gas Consumption (N.G, m3n/Hour)

Average 16

Gas Consumption (L.P.G, m3n/Hour)

Average 11.7

Temperature Monitor

Four Digital Display

Temperature Protection

Yes

Oil Tank

200L 

Feed Door

55x50cm

Chimney

5Meter 

Chimney Type

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

Residency Time

2.0 Sec.

Gross Weight

3000kg

External Dimensions

175x120x140cm

tenders of incienerator,incineration waste recovery
HICLOVER Solution for Fighting COVID-19, with ISO9001:2015/CE(2006/42/EC,2014/30/EU) Certification.
1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)
2. Auto Roll Air Filter for Clean Room(Air Purification)

Nanjing Clover Medical Technology Co.,Ltd.
Tel:  +86-25-8461 0201    
Mobile: +86-138139 31455
WhatsApp: 008613813931455
WhatsApp: 008615380948599
Twitter ID: @hiclovercom
Wechat: 008613813931455 (ID: hiclovercom)
Wechat: +8615380948599 (ID: wasteincinerator)
Website1: www.hiclover.com 
Email1:     [email protected]
Email2:    [email protected]    
Email3:   [email protected]  

HICLOVER Incinerator/Parts Range

Main Feature

Medical Waste Incinerators

HICLOVER 10-500kgs/Hr.Double Combustion Chambers

Single Combustion Chamber

Small, Cheap,10-20kgs/Hr.

Three Combustion Chambers(Optional)

3 Chambers for high risk waste

Pet Cremation Equipment

For Pet(small/big) Cremation Business

Animal Incineration Equipment

For other animal incineration


Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Brand HICLOVER HICLOVER HICLOVER HICLOVER
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg
Control Mode PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm
Chimney 3Meter 3Meter 5Meter 5Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm

Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)

TS500(PLC)

Burn Rate (Average)

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.

PLC Auto.

PLC Auto.

Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Power

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Temperature Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Type

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

800℃–1000℃

800℃–1000℃

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm

450x210x300cm


CE and ISO Certification Pass Incinerators

 

2021-03-02

Equipo de cremación

Información básica.

Modelo NO .: precios de equipos de crematorio
Mercados de exportación: Global

Descripción del producto

Nanjing Clover Medical Technology Co., Ltd. es un fabricante líder de incineradores de desechos en China. Somos fabricantes locales y uno de los mayores exportadores de China. El equipo técnico de incineración pirolítica es el principal tratamiento de desechos en todo el mundo, para desechos médicos, incineración de animales, incinerateur yd150, incinerateur yd150 italie, venta de equipos de incineración, incineración, incineración “cámara de filtro de humo”, incineración de 35 kg, incineración de desechos de animales, mascota cremación y otros sólidos wste. La capacidad de 10kgs / Hr. Hasta 500kgs / Hr., Hasta 6ton por día. Actualmente, suministramos diferentes series para los requisitos de los clientes locales y diseñamos un incinerador actualizado con nuestra tecnología líder. La característica de diseño actualizado de nuestra gama de incineradores los convierte en uno de los más rentables del mundo.
Características principales:
* Todos los modelos con doble cámara de combustión.
* Chimenea / chimenea de acero inoxidable, larga vida útil. * según pedido
* Alta temperatura, larga vida útil del incinerador.
* Instalación gratuita o mínima en obra.
* Alta velocidad de combustión, de 10 kg a 500 kg por hora, hasta 6 toneladas por día.
* Plano de control PLC. * según pedido
* Nuevo diseño para el negocio de cremación de animales de compañía.
* Garantía de un año en incinerador y piezas en stock.
Ámbito de aplicación:
1. Hospital y clínica: Residuos Iátricos, Residuos Infecciosos, Vendajes, Biorresiduos, Medicina.
2. Matadero y hospital y granja de mascotas: animal muerto, biorresiduos.
3. Comunidad, puerto y estación marítima: residuos sólidos urbanos, etc.
4. Laboratorios, ubicaciones remotas, operaciones de socorro en casos de desastre, cremación de animales

Artículos / Modelo YD-10C YD-20C YD-30C YD-50C
Tasa de combustión (kg / hora) 10 kg / hora 20 kgs / Hr. 30 kg / hora 50 kgs / Hr.
Capacidad de alimentación (kgs) 40 kilogramos 40 kilogramos 50 kilogramos 80 kilogramos
Peso del equipo 1200 kilogramos 1200 kilogramos 1800 kilogramos 2200 kilogramos
Imagen
Cámara primaria (litros) 200 200 250 400
Cámara secundaria (litros) 140 140 140 140
Dimensiones externas (cm) 170 x 140 x 160 170 x 140 x 160 170x140x190 180x160x200
Dimensiones internas (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Tanque de aceite (litros) 50 100 100 150
Apertura de la puerta (cm) 38 x 48 38 x 48 38 x 48 45 × 55
Chimenea (M) 5 5 5 5
Tipo de chimenea Acero inoxidable Acero inoxidable Acero inoxidable Acero inoxidable
Cámara secundaria SÍ SÍ SÍ SÍ
Cámara de mezcla de combustión SÍ SÍ SÍ SÍ
Cámara de filtro de humo SÍ SÍ SÍ SÍ
Combustible de combustión Gas de petróleo Gas de petróleo Gas de petróleo Gas de petróleo
Tiempo de residencia 2,0 seg. 2,0 seg. 2,0 seg. 2,0 seg.
Monitoreo de temperatura SÍ SÍ SÍ SÍ

installer un appareil de chauffage à décharge diesel

blaze principalement des médicaments (tous types de dosage………… sirops, tablettes, injectables) consommables cliniques, en plus des liquides biologiques ………….
Capacité environ 10 kg / h. mettre en place un brûleur à décharge diesel pouvant accueillir une collection de tonnes d’environ 100 kg avec un besoin de combustion quotidien d’environ 500 kg par jour de 8 heures. Brûleur industriel à nuire.
les déchets de médicaments comme Alu, PVC, PVDC etc. Installation pour brûler les déchets de chien de compagnie coût, existence, conditions de règlement où il est possible d’acquérir en Russie? Je vise une capacité comprise entre 200 et 400 kg.
1.2 PEINTURE DE ZONE.
Effectuer la peinture nécessaire pour la zone non ou autrement spécifiée, ainsi que la peinture de surface des objets juste saisis en usine

1.3 FORMATION SUR LE LIEU.
une. Soumettre [6] des copies complètes des directives d’exploitation décrivant les procédures détaillées nécessaires au démarrage, à l’exploitation et à la fermeture du système. Comprend dans les directives le nom du fournisseur, le numéro de version, le guide de service, la note des pièces, ainsi qu’un récapitulatif rapide de tous les outils en plus de leurs attributs de fonctionnement typiques. En plus de [Six] copies complètes des instructions de maintenance donnant des thérapies de maintenance régulières, des pannes réalisables et des solutions de réparation supplémentaires, des guides de réparation, en plus des représentations schématiques simplifiées du système tel que configuré.

3.6. Efficacité.
Préchauffez l’incinérateur pendant 4 heures pour atteindre la température de prise de vue de 982 degrés C [1800] degrés F. Pesez et collez également le poids des frais généraux. Chargez le brûleur à la capacité de combustion nominale en kg de livres supplémentaires par heure pendant une période de [4] heures en plus de le faire fonctionner conformément aux directives écrites du fabricant. Contenir dans les tests de performance le traitement des installations de facturation mécanique, le brûleur, les outils de contrôle de la contamination de l’air, les cendres.
Effectuer des tests à l’échelle complète pour un cycle de procédure complet, et de même garder un œil sur les performances pour valider la conformité avec l’arrangement nécessite d’envoyer un enregistrement sur les résultats de sécurité. Une fois que le brûleur a vraiment refroidi, pensez aux résidus. Le poids du dépôt ne dépassera pas 5,0 pour cent de produit combustible du poids total de la charge.
Après le nettoyage, le brûleur laissera tomber tout type de preuve d’usure, tel que du réfractaire ébouriffé ou renversé, la flexion des composants, ainsi que la peinture extérieure tachée.

– – Contrôler.
Testez l’incinérateur sous de véritables problèmes de tir. Validez avec des tests que tous les contrôles fonctionnent dans les limites optimales et minimales de température ou de minutage. Imitez les véritables problèmes à haut risque tels que les réchauffements ainsi que les échecs d’incendie en réduisant les configurations pour l’activation de la limitation ainsi que les contrôles de sécurité.

– – Température de traitement.
Faites fonctionner le brûleur en cas de problèmes typiques de lots pendant au moins 6 heures. – – Système de gaz: Double gaz (aussi bien pour le pétrole que pour le gaz)

Types of waste Generated in the health facility

HICLOVER Incinerator/Parts Range


Medical Waste Incinerators

HICLOVER 10-500kgs/Hr.Double Combustion Chambers

Single Combustion Chamber

Small, Cheap,10-20kgs/Hr.

Three Combustion Chambers(Optional)

3 Chambers for high risk waste

Pet Cremation Equipment

For Pet(small/big) Cremation Business

Animal Incineration Equipment

For other animal incineration



Temperature Control, Primary and Secondary
Stoking tools
Stainless Steel Spark Screen
Primary Chamber Door Locking System
HICLOVER Solution for Fighting COVID-19, with ISO9001:2015/CE(2006/42/EC,2014/30/EU) Certification.
1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)
2. Auto Roll Air Filter for Clean Room(Air Purification)

Nanjing Clover Medical Technology Co.,Ltd.
Tel:  +86-25-8461 0201    

Mobile: +86-138139 31455
WhatsApp: 008613813931455
WhatsApp: 008615380948599
Twitter ID: @hiclovercom
Wechat: 008613813931455 (ID: hiclovercom)
Wechat: +8615380948599 (ID: wasteincinerator)
Website1: www.hiclover.com 
Email1:     [email protected]
Email2:    [email protected]    
Email3:   [email protected]  
Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Brand HICLOVER HICLOVER HICLOVER HICLOVER
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg
Control Mode PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm
Chimney 3Meter 3Meter 5Meter 5Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm

Prefabricated Incinerator with a concrete base and chain link fence.The incinerator should be portable, very easy to install, allow for re-location, fit in small space with a chimney length of 4m to drive smoke away to safe heights and also cause current flow of fresh air to drive moisture out of the rubbish such that the bad odour from sanitary pads is removed and the waste is dried automatically. The incinerator should be made of a non-rusting material such as stainless steel of 4mm gauge. It should not require an extra heat source, but use the heat generated from burning of the solid waste as its major energy source. This incinerator should be capable of raising temperature to its maximum within three minutes and the heat losses kept to the minimum.Average Temperature
Average Temperature; 850 degrees Cent grade (As per Ministry of Health) 
Capacity Capacity; 60 Liters, Auto combustion/nonfuel assisted 
Destruction rate 30 liters per hour, waste reduction up to 95%volume
Batch Load 5Kgs per load
Life Span Life span; minimum 10 years

Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)

TS500(PLC)

Burn Rate (Average)

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.

PLC Auto.

PLC Auto.

Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Power

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Temperature Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Type

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

800℃–1000℃

800℃–1000℃

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm

450x210x300cm

CE and ISO Certification Pass Incinerators

 

2021-03-02