Supervision of installation of the new incinerator set shall be provided by the successful Bidder while labour
and heavy duty equipment shall be provided by CEB.
? The successful Bidder shall submit to CEB, prior to shipment of the incinerator set, its procedures for the
installation of the incinerator and exhaust chimney. This should include all mechanical, civil and electrical drawings
and detailed methodology for successful installation of the incinerator set. It shall also include preliminary tests
that have to be carried on the incinerator unit. .
? The successful Bidder shall provide all necessary test equipment ( test kit for emission measurements) for
carrying out of tests during testing & commissioning of the incinerator set. . The successful Bidder shall be
responsible for the satisfactory completion of all tests and remedial action in case of any anomaly. Corrective action
by the successful bidder shall be prompt and to the satisfaction of the CEB Engineer.
? Scheduled date for commencement of supervision of installation, testing & commissioning works shall be mutually
agreed between the successful Bidder and CEB
1 Burning Capacity 200 kg/hr
2 Chamber Dual
3 Fuel Source type Gas
4 Optional fuel source Diesel ( Rate to be quoted separately)
5 Temperature ? Range:
Min: 900
Max: 1500
Must have
? Temperature Monitoring/ Thermostat Control/
Constant Run Fan
Hospital waste incinerator
Capacity: 50 Kg / Hour
Brand new complete working
Burners: Diesel (Preferably dual gas / diesel)
Primary and secondary chamber
Environment friendly
Manual loading and unloading
WASTE INCINERATOR
– 150 KG/HR
– Compliant with EU rules, Directive 2000/76/EC
– Fuel type: Diesel
– Easy management and maintenance
– Temperatures:
850 deg C for municipal waste
1000 deg C for medical waste
1100 deg C for dangerous waste containing halogenated organic substances with content of chlorine or its compounds.