PROGRESSED MEDICALWASTE HEATER


Incinerator design A.
Burn Rate 65kg/h minimum.
Weight (kg), please recommend:.
Second Chamber.
Gas Retention Time – – – – 2 Secs. Power Supply – for – Control Box – 220V-240V 50Hz solitary stage.
10m Pipe Pipeline, show size. I000 Litre Gas Container+ Pipeline System, show quantity.
Included chimney expansion, suggest elevation. Guarantee, indicate no of years. The minimum combustion temperature degree of the main chamber will certainly not be less than 800 degrees C;

Second combustion.
The residence time in the second chamber will not be much less than 2 seconds;.
The gas temperature degree as determined versus the within wall surface area in the second chamber, not in the fire location, will not be a lot less than as received Lots 1-7;.
Both the major as well as the 2nd temperature degrees will certainly be maintained till all the waste has been entirely ignited;

Smokeshaft.
The smokeshaft will have a marginal elevation of 4 meters over ground degree;.
The minimal leave rate of the discharges shall not be less than 10 metres/second;

Temperature Level Warnings.
When the secondary temperature drops to detailed below the required temperature level;

General, a noticeable and/or distinct alarm system to encourage the driver.
Control box can be gotten rid of in addition to placed on different stand at least 1.5 meters from incinerator at around 1.6 meter elevation;

Great Deal 2.
Point 5 Burner design B.
Burn Price 150kg/h minimum.
Weight (kg), please suggest:.
Extra Chamber.
Gas Retention Time – – – – 2 Seconds. Diesel/LPG/LNG, please suggest.
One year Spare Parts Package for complete maintainability.
Thing 6 10m Tube pipe Pipeline, indicate dimension.
Item 7 I000 Litre Gas Tank + Pipeline System, suggest quantity.
Item 8 Included smokeshaft extension, show altitude.
Warranty, show no of years.
Large amount 3.
Point 9 Incinerator layout C.
Burn Rate 250kg/h minimum.
Weight (kg) please indicate:.
2nd Chamber.
Gas Retention Time 2 Secs.
Gas Diesel/LPG/LNG, please show.
Power Supply for Control Box 220V-240V 50Hz single stage.
Minimum operating temperature level 920 ° C, please indicate.
One year Spare Components Bundle for complete maintainability.
Product 10 10m Tube pipeline Pipeline, show length.
Thing 11 I000 Litre Gas Container + Pipeline System, indicate volume.
Thing 12 Extra chimney extension, reveal height.
Guarantee, indicate no of years.
Lot 4– – Warm Waste Burner.
Point 13 HTW Burner style D.
Burn Price – – – – 150kg/hour minimum. Weight( kg), please show:.
Additional Chamber.
Gas Retention Time 2 Secs.
Fuel Diesel/LPG/LNG, please suggest.
Power Supply for Control Box 220V-240V, solitary phase 50-60Hz.
Minimum running temperature level 1200 ° C, please show.
One year Spare Components Package for complete maintainability.
Thing 14 10m Hose pipeline Pipe, suggest size.
Item 15 1000 Litre Gas Tank + Pipeline System, reveal amount.
Product 16 Added smokeshaft development, reveal elevation.
Solution guarantee, reveal no of years.
Good deal 5– – Mobile Burner. 2. Incinerator gives 2 chamber incineration in addition to holds gasses for a minimum of 2 seconds.
3. Each incinerator needs to have appropriate labelling for parts/areas of high job health and wellness threat on the incinerator.
& & Country Issues, or European Union regulations and guidelines.

Item 17 Mobile Burner version E.
Burn Rate Price minimum.
Weight (kg), please show:.
Second Chamber.
Gas Retention Time – – – – 2 Seconds. Gas – Diesel/LPG/LNG, please program. Power Supply for – Control Box – 220V-240V 50Hz single stage. Minimum operating temperature level 850 ° C, please program. One year Spare Parts Bundle for complete maintainability. Product 18 10m Hose pipe Pipeline, reveal
dimension. Item 19 1000 Litre Gas Storage Tank + Pipeline System, show volume.
Item 20 Extra chimney expansion, suggest height.
Great deal 6– – Mobile Burner.
Item 21 Mobile Burner design F.
Burn Price 100kg/h minimum.
Weight (kg), please suggest:.
Additional Chamber.
Gas Retention Time – – – – 2 Secs. Gas – Diesel/LPG/LNG, please suggest –. Power Supply – for – Control Box – 220V-240V 50Hz solitary phase. Minimum running temperature level 850 ° C, please recommend. One year Spare Components Plan for full maintainability.
Item 22 10m Hose pipe Pipe, show size.
Point 23 1000 Litre Gas Tank + Pipeline System, recommend quantity.
HTW Mobile Burner style G.
Burn Price 100kg/h minimum.
Weight (kg), please indicate:.
Extra Chamber.
Gas Retention Time – – – – 2 Seconds. Fuel – Diesel/LPG/LNG, please show.
Power Supply for Control Box – – – – 220V-240V 50Hz singular phase.
Minimum running temperature level 1200 ° C, please suggest.
One year Spare Parts Package for total maintainability.
10m Pipeline Pipeline, show size.
1000 Litre Gas Storage Tank + Pipeline System, suggest volume