Supply, Installment and also appointing of Waste Incineration system


De manera atenta solicito me colabore con la cotizacion del incinerador incluyendo envió.Puri team a friendliness organization in Indonesia is interested to introduce renewable energy in Indonesia or to utilize the energy resources for its center around Indonesia. Kindly request to have even more info on burner innovation as it is needed to process 100 heap to 500 load waste aday. In the Structure of our Specialized Projects Monitoring, we are currently in look for distributor of Waste Incineration system for hazardous waste, the incineration system will certainly be utilized for incineration of Prohibited Drugs and toxic materials, waste poultry, Dead Animals “cows, goats”, Spoiled vegetables, Etc. at custom-mades Ports. For that we would like to request for your technological and also Financial Proposal for supply, setup and also Commissioning of Contaminated materials Incineration system with incineration capacity of at the very least 400 Kg/ human resources.

Web Page
– The main body of the burner will be stainless-steel and also the outside insulation density of not less than 7 mm made from zinc or phosphate for temperature insulation
– The major entrance of the Burner ought to be 150 mm thick as well as stamina not less than 170 kg/m3. The door should be automatic with remote to operate.
– The Incinerator ought to be developed in accordance of the environmental law adhered to in nation of origin or based on Saudi Arabian PME Rules.
– The incinerator should have fuel storage space with ability of 1000 litre.
– The burner shall have the capacity to run with temperature level approximately 1300 OC in the main chamber and also it can get rid of the residual while the incinerator functions
– The inside body of the incinerator should have insulation layer made from calcium with thickness of 50 mm while the thickness of the interior surface ought to be 100 mm in order to stand with 1300 OC.
– All the supporting dental braces of the burner shall be mounted on stainless-steel.
– The space between the outside and internal body will be loaded with the unique insulation material.
– The exhaust will not stay more than two (2) secs in the second chamber and also this chamber shall be built with high thickness of ceramic sanctuary.
– There needs to be a stack with 4 (4) meter from the leading surface area of the burner as well as can be eliminated as well as set up.
– The incinerator will have control device for exhaust gases to ensure that the emission shall fulfill the PME resource standards
– The power supply ought to be 220– 380 Volts, 60 Hz. and also the burner shall be provided with control board revealing the following:

Page|5

– Temperature level of second and key chamber.
– Condition of pressure gages.
– Alarm revealing if there is any kind of leakage or misconducting in the power.
– Sign for straining the heater.
– Timer for automatically turning off the incinerator.
– All the burner parts including fuel pumps, followers, pipelines and also shutoffs can be run in high ambient temperature level (50OC).
– All components of the burner will be repainted in one shade which ought to be resistant to high humidity, heat as well as high dust/ sandstorm.
– 3 years warranty with extra components and also technical supply and.
– ten years warranty for offering extra parts starting from the date of initial warranty expiry.

The bidder will give all essential information connected to the facility measurements, room area needed for the whole system as well as all procedure needs, Details concerning required center (wall mount) including Design, civil job and also electromechanical details including electricity, water pipes, fuel pipelines, tanks, and so on. Called for Operation staff, Fuel intake price of the entire system. Considering that our job is a turnkey task including Style, Build & & Operate of central incineration facility covering all the above mentioned information and we have to work with all civil jobs as well as essential needs to run the system.

In the Structure of our Specialized Projects Administration, we are presently in search for distributor of Waste Incineration system for dangerous waste, the incineration system will certainly be used for incineration of Prohibited Drugs as well as hazardous materials, waste fowl, Dead Animals “cows, goats”, Spoiled veggies, AND SO ON at customizeds Ports. For that we would like to demand for your economic and also technical Proposal for supply, setup and Commissioning of Hazardous Waste Incineration system with incineration capacity of at least 400 Kg/ hr. 3

The proposal should include the complete summary of the entire system: Overall expense of supply, Setup, appointing, Automatic feeding, automatic de- ashing during procedure, as well as efficient gas cleansing system (damp, high or dry temperature ceramic filters), constant discharge monitoring system (CEMS), as well as all other accessories, Control panel for all components of the system, Repairing alarm system covering all parts of the system, to alert the operator for the mistake that might develop throughout the procedure, and to do instant corrective action, Emergency Quit button that can quickly shut off/ shut down all significant component of the system in situation of emergency situation., Packing system: side loading, Number of burners: minimal 7 burners, (5 for key chamber, 2 for second chamber), Gas: Diesel, The system must function constantly for at least 12 hrs per day, The key chamber: Heavy- duty anodized Rust resistant steel casing with minimum thickness 7mm.

The bidder will provide all necessary details related to the center measurements, space area required for the entire system and also all operation needs, Information regarding needed facility (wall mount) including Layout, civil work and electromechanical information including power, water pipelines, fuel pipelines, storage tanks, and so on.

The bidder shall provide all necessary details related to the facility dimensions, space area required for the whole system and all operation requirements, Details about required facility (hanger) including Layout, civil work and electromechanical details including electricity, water pipes, fuel pipes, tanks, etc. Complete Drawing & 3D drawing Clearly Show All Sections and Details of the System. List of spare parts and checklist. Required Operation staff, Fuel consumption rate of the whole system. Since our project is a turnkey project including Design, Build & Operate of central incineration facility covering all the above mentioned details and we have to coordinate all civil works and necessary requirements to operate the system.