Capability: 20KG/Hr, Temp Variety: 600 Deg. C– – 1100 Deg. C Gas Supply: Natural Gas/Diesel Dual Burning Chamber Complete Scrubbing System (Dual Resulting Gas Washer), Dual Blower, Chimney Elevation: 8m Electric Supply: 220/240Volt, Single Phase 1. Kind of waste: Waste 2. Any type of sort of other type: 3. Amount of waste created daily in […]
Tag: waste incinerators
infectious waste pyrolysis manufacturer chinalarge family pet incinerators
Major components are– – Ethanol, Paraffin, Silicon, Aluminium chloro hydrate, Bentone, LPG quote for burners for industrial chemical wastes therapy, 1 burning price need to be Average 30kgs/h 2 within chamber item need to be refractory concrete cement 3 it operates in three system diesel oil/ Gas or LPG 4 voltage must be 220V 5 […]
incinerator manufacturer china
The sludge shall be properly atomized by means of compressed air in the burner so as to ensure complete combustion of the sludge. An air compressor complete with a receiver shall be included in the incinerator. Both compressor and receiver shall be mounted on the same skid as the incinerator. The […]
china heater distributor and also exporter
Primary Burning Chamber Waste Charging Door: Given with refractory cellular lining with securing gaskets Ash Eliminated Door: Supplied with refractory cellular lining with sealing gaskets Exterior Body MOC: Mild Steel, 5mm Main Chamber: Stainless-steel Running Temperature degree:800. ± 50 ◦ C. Insulation: Insulation Block. Burner Kind: Kanthal Al High Quality. Power Use: 75 KW (Initial […]
burner maker in china
1. Is your house time greater than 2 secs? 2. Is the primary as well as additional air preheated? 3. Could it be given as a constant system? 4. Exists a monitoring system for functional criterion? (temperature). 5. Exists an info logging system? 6. Does it offer control treatments to change waste feed, grate rate, […]
waste incinerator manufacturers china
Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration […]
waste burner provider in china
Burning rate: 250 Kg/hr. It should be able to Operate not Less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc… Design Specification: Types A, B, C, D, and E of medical waste “PYROLYTIC” combustion, by controlling the gasification of waste. The incinerator […]
laboratory incinerator china manufacturer
Solid waste to be incinerated Cartons, rags, cotton and other wastes associated with generation of electricity loaded in the incinerator in bags. Loading capacity: At least 100 Kg / h Start up fuel Diesel Oil 2.3 Incinerator Supply The incinerator shall be equipped with […]
TECHNICAL INCINERATORS REQUIREMENTS FOR 2 health centers in Kenya
TECHNICAL INCINERATORS SPECS FOR 2 medical facilities INTRO All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal […]
00 BEDS HEALTHCARE CENTER INCENERATOR TECHNICAL INFORMATIONS
1) Policy – – – – Incinerator: It is developed to sanitize medical waste, lower its amount, and make its parts unrecognizable all in one completely confined as well as automated system. 2) Waste Disposal Plan a)Classification The contaminated waste is filled up right into the leading stainless-steel chamber where a tough shredder reduces the waste into […]