manufacturer of ha zardous waste incinerator in china

Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system
Imputing door Mouth Width (mm): 760*760 (approx.)
Chimney External Diameter (mm): 300 ± 10
Combustion Improver Device: 0.11kw, Fuel consumption: 7kg/ hour (max)
Re-Burning Device: Oil consumption: 5kg/h, 0.37kw, Oil consumption: 10-20kg/h
Voltage: 380v/220v AC, Warranty: 1 Year, 50 Hz
Per your advertisement for 300 kg.hr. Model – We need to know the price via return.
How many Kg. of Fuel would be required for running this Model 10 hrs. everyday.
We have our own Freight Forwarding Agent.
We had a Contract for Garbage Management before their Civil War for 120 Tons/Day for one Municipality in North Africa
Medical Waste Incinerator
Dual Chamber (Primary & Secondary) with insulation slabs (fully insulated internal refractory lining) along with
controlled air blower for each chamber
Insulation / Refractory Thickness: ≥ 100mm
Chamber plate thickness: ≥ 6mm
Fuel Type: Natural gas based on burning fuel in combustion chambers
Waste Capacity: ≈ 150 Kg/Day
Incineration capacity: ≈ 25 Kg/Day (Separate waste charging and waste removal doors)
Burners: At least with (02) burners of automated start and stop functions
Combustion efficiency: > 97%
Temperature: programmable temperature with temp monitoring system
Residence time: 2 second in secondary chamber
Heating value: 4000 Kcal
Temperature Range: ≈ min 800ºC to max 1200ºC
Electrical supply: 220V with single phase
Chimney Plate Thickness: ≥ 5mm
Water scrubber: Scrubbing using reagent like lime & should made of SS 10 gauge of non-corrosion properties and painted
exteriorly by equipment grade heat resistive enamel
Chimney Height: between 15-25 feet